Fig. 3: Slip surface growth mechanism for the Feijão dam failure.
From: The slip surface mechanism of delayed failure of the Brumadinho tailings dam in 2019

a Layout of raisings and layering of tailing in the Feijão dam; b Initiation and propagation of slip surfaces during the dam construction/operation and after the closure.