Fig. 4: Numerical modelling of the construction and operation stage.
From: The slip surface mechanism of delayed failure of the Brumadinho tailings dam in 2019

a Layouts of dams and tailings for ten raises. b Distributions of accumulated total shear strain at raisings 7–10.