Fig. 6: Modeled cross-sectional profiles along the center flowline near the terminus in July over the period 2020–2100 (color-coded by the top scale) using α1 = 0.6, α2 = 0.15, β = 34.
From: Active ice sheet conservation cannot stop the retreat of Sermeq Kujalleq glacier, Greenland
