Fig. 7: Numerically simulated underground stress field. | npj Natural Hazards

Fig. 7: Numerically simulated underground stress field.

From: Characteristics and mechanism of MBT anomaly of Karakum desert related with the Hindu Kush earthquake

Fig. 7

3D visualization (a) and profiles at different depths (b) The loading time of the geostress simulation is 1000 years. The red and white circles represent the main shock and the location of the coal site, respectively. The solid black line and the dashed red line represent the fault zone and the Karakum Desert boundary, respectively.

Back to article page