Table 3 Return periods of the most extreme modeled storm-tide from historical storms at each study site under all scenarios

From: Projections of tropical cyclone-driven storm-tide risk to critical infrastructure in the Bay of Bengal

Site

Storm

Storm-tide (m)

Return period (years)

   

pc

cnrm

cmcc

ecearth

hadgem

Madras Atomic Power Station

Thane

1.20

70

80

60

50

50

Kovvada Atomic Power Project

Hudhud

1.71

1190

230

350

60

90

Gangamati

Sidr

5.08

180

1850

3250

1030

950

Mazher Char

Aila

2.57

70

70

140

50

60

Boyar Char

Sidr

3.61

80

120

520

100

110

Tazumuddin

Sidr

3.19

70

90

280

70

90

Galachipa

Sidr

4.12

100

320

1180

260

280

Kuakata

Sidr

4.97

210

1730

3340

780

880

  1. Return periods are rounded to the nearest decade.