Table 1 For the power sector, all cases experience a decrease in total cost due to decreased investment spending.
From: Simulated co-optimization of renewable energy and desalination systems in Neom, Saudi Arabia
Power Sector | Investment cost [M$] | Operating cost [M$] | Total cost [M$] | % Change of Total Cost |
|---|---|---|---|---|
Independent / Co-Optimization | Â | |||
Base | 1705 / 1626 | 299 / 271 | 2004 / 1897 | −5.3 |
KSA Grid | 1146 / 1143 | 359 / 348 | 1505 / 1490 | −0.9 |
Wind Only | 5088 / 4517 | 149 / 150 | 5236 / 4667 | −10.9 |
PV Only | 13,766 / 12,892 | 1094 / 1079 | 14,860 / 13,971 | −6.0 |