Table 2 System annual costs (Base Model)
From: A resilient battery electric bus transit system configuration
Parameter | Amount ($) | Percentage (%) |
|---|---|---|
Construction cost | $ 39,957.07 | 0.574% |
Chargers cost | $ 83,004.14 | 1.193% |
Battery cost | $ 697,916.73 | 10.028% |
Fleet cost | $ 5,332,936.24 | 76.629% |
Operational cost | $ 805,567.01 | 11.575% |
Total annual cost | $ 6,959,381.19 | 100.00% |