Table 2 System annual costs (Base Model)

From: A resilient battery electric bus transit system configuration

Parameter

Amount ($)

Percentage (%)

Construction cost

$ 39,957.07

0.574%

Chargers cost

$ 83,004.14

1.193%

Battery cost

$ 697,916.73

10.028%

Fleet cost

$ 5,332,936.24

76.629%

Operational cost

$ 805,567.01

11.575%

Total annual cost

$ 6,959,381.19

100.00%