Table 5 Results of BEB system configuration (Robust Models)
From: A resilient battery electric bus transit system configuration
Models | Total system cost ($/year) | BEB fleet configuration (# × kWh) | Number of charging stations | Power of charging units (# × kW) | Number of poles (#) |
|---|---|---|---|---|---|
Base Model | $ 6,959,381.19 | 54 × 100 34 × 200 3 × 300 | 5 | 1 × 250 4 × 500 | 8 |
Robust Model k = 1 | $ 7,186,845.54 | 54 × 100 33 × 200 2 × 300 1 × 500 1 × 600 | 18 | 9 × 250 9 × 500 | 19 |
Robust Model k = 2 | $ 7,524,798.35 | 47 × 100 29 × 200 9 × 300 5 × 400 1 × 500 | 33 | 21 × 250 12 × 500 | 33 |