Table 6 System annual costs (base and robust models)
From: A resilient battery electric bus transit system configuration
Parameter | Base Model | Robust Model, k = 1 | Robust Model, k = 2 |
|---|---|---|---|
Construction cost | $ 39,957.07 | $ 143,845.43 | $ 263,716.63 |
Chargers cost | $ 83,004.14 | $ 242,086.54 | $ 405,324.47 |
Battery cost | $ 697,916.73 | $ 729,882.38 | $ 836,434.56 |
Fleet cost | $ 5,332,936.24 | $ 5,332,936.24 | $ 5,332,936.24 |
Capital costs | $ 6,153,814.18 | $ 6,448,750.60 | $ 6,838,411.89 |
Operational costsa | $ 805,567.01 | $ 737,837.80 | $ 686,386.46 |
Total annual cost | $ 6,959,381.19 | $ 7,186,588.40 | $ 7,524,798.35 |