Table 8 Abbreviations and notations
From: A resilient battery electric bus transit system configuration
Abbreviation | Description | Abbreviation | Description |
|---|---|---|---|
BEB | Battery electric bus | SP | Sub-problem |
WTT | Well-to-tank | LB | Lower bound |
GHG | Greenhouse gas | UB | Upper bound |
ToU | Time-of-Use | IMP | Inner master problem |
SoC | State of charge | ISP | Inner sub-problem |
MILP | Mixed integer linear programming | ILB | Inner lower bound |
C&CG | Column and constrained generation | IUB | Inner upper bound |
NC&CG | Nested column and constrained generation | GTFS | General Transit Feed Specification |
MP | Master problem | VKT | Vehicle kilometers traveled |
Sets | Description | Index | Description |
I | Set of potential charging station locations | i, i′ | Potential charging station location index |
B | Set of buses | b | bus index |
Jb | Set of segments accomplished by bus b | j | Segment index |
Ast | Set of power levels of the station charger unit | t | Timeslot index |
Abatt | Set of battery capacity levels | q | Failure scenario index |
Rb,j,i | Set of timeslots of the recovering time of bus b after accomplished segment j at the location i | r | Inner-level C&CG scenario index |
Ξ | Set of the uncertainty of charging station failure | ω | Demand measurement interval index |
Ω | Set of daily demand measurement intervals | ||
T | Set of the timeslots within a workday | ||
Tω | Set of timeslots in demand interval ω | ||
Parameters | Description | Parameters | Description |
ρst | Construction cost of a charging station ($ per location) | Qmax | Maximum battery size (kWh) |
ρch | Charger cost ($ per kW) | λ1 | Upper charging limit related to the battery capacity |
ρpo | Charger pole cost ($ per unit) | \({P}_{i,t}^{\max,{st}}\) | The station’s upper limit of power in timeslot t according to ToU (kW) |
ρbatt | Battery cost ($ per kWh) | ϑmin | Minimum SoC limit (%) |
ρbus | Bus cost without battery ($ per bus) | ϑmax | Maximum SoC limit (%) |
δ | Number of workdays (#) | ebase | The constant energy consumption rate (kWh per km) |
Ts | Timeslot duration (hour) | ebatt | The energy consumption rate factor relevant to the BEB battery size |
\({\rho }_{t}^{{elect}}\) | Electricity rate according to ToU in timeslot t ($ per kWh) | \({P}_{{po}}^{\max }\) | The charger pole’s maximum power (kW) |
\({\rho }_{t}^{{em}}\) | WTT GHG emissions rate in the timeslot t ($ per kWh) | db,j | Segment j∈ Jb length of bus b (km) |
τ | Annualization factor (#) | \({N}_{i}^{\max }\) | Maximum number of charger poles in charging station i (#) |
ρDC | Electricity daily demand charges ($ per kW) | k | Maximum number of failed stations (#) |
ηch | Charger efficiency (%) | ρpen | Penalty cost for the failed bus ($) |
\({P}_{t}^{\max,{net}}\) | The network upper limit of power in timeslot t according to ToU (kW) |