Fig. 3: Change in key variables after gas system failure at t = 0.

a Schematic diagram of gas terminal users. When the major failure occurs, both the gas turbine and the ordinary gas load can only work with the gas stored in the blue-marked pipeline. The initial ALP for the gas turbine is 5000 kg, and the initial mass flow rates of the gas turbine and the ordinary gas load are 5 kg/s and 3 kg/s, respectively. b Mass flow curves of the gas turbine under different generation reduction ramp rates. The curve of the critical declining ramp rate is highlighted in bold red. When the ramp rate is lower, the gas turbine is faced with a sudden shutdown due to the insufficient inlet pressure. When the ramp rate is higher, the gas turbine is actively stopped before the inlet pressure drops to the threshold. c ALP curves under different generation reduction ramp rates. d AET curves under different generation reduction ramp rates. If the ALP has not been used up when the gas turbine stops, the remaining portion will be consumed at a constant rate by the ordinary gas load. Source data are provided as a Source Data file.