Table 2 Updates to E-lite before inclusion in the ITER full model

From: ITER full model in MCNP for radiation safety demonstration

#

Update

1

A new representation of the Blanket Shield Modules in rows #7–#12 and the explicit representations of cooling channels in 80% of the blankets

2

Implementation of dedicated block structure elements to facilitate local models upgrade (later called “envelopes”) for: upper port (UP) chimneys, TCWS, the Thermal Shield shrouds, the Tokamaks Dust Filter System in UP #4–#7 and ICF

3

The adjustment of envelopes to include the cryostat cryopump in lower ports (LP) #7 and #13

4

The adaption of the correction coil envelopes to a 360° representation of the machine

5

The adjustment of the envelopes of Vacuum Vessel Poloidal Sector #44 penetrations in LP#01-#09-#11-#13-#15-#17

6

An updated representation of UP#4-#5-#6-#7 port plug environment

7

The implementation of the spare pre-compression rings

8

The amendment of the interface between the divertor inner rail cover plate and the Blanket Shield Module #1.