Fig. 5: Potential leakage paths in the wellbore. | Nature Communications

Fig. 5: Potential leakage paths in the wellbore.

From: Review on natural hydrogen wells safety

Fig. 5: Potential leakage paths in the wellbore.

a between the casing exterior and the cement, b between the cement plug and the casing interior, c the cement plug, d the casing wall, e the cement cracks, and f between the cement and the formation. Figure adapted from ref. 129 with permission from Springer Nature.

Back to article page