Table 1 Simulated Scenarios for Bridge and Port Closures
From: Rethinking infrastructure design from component failure to systemic resilience
Scenario | Description |
|---|---|
11-Week Bridge Closure | Temporary bridge closure; quick replacement to allow traffic flow. |
11-Week Port Closure | Port closed, disrupting shipping and transport for 11 weeks. |
4-Year Bridge Closure | An extended bridge closure with no immediate alternative, causing prolonged disruption. |
11-Week Bridge and Port Closure | Simultaneous 11-week closure of both bridge and port, testing resilience to dual disruption. |
4-Year Bridge and 11-Week Port Closure | Extended bridge closure with port closed for 11 weeks, testing compounding effects over time. |