Fig. 6: LCOH breakdown for least-cost locations. | Nature Energy

Fig. 6: LCOH breakdown for least-cost locations.

From: Mapping the cost competitiveness of African green hydrogen imports to Europe

Fig. 6

Cost for the least-cost location in each country under scenario 2, cash-constrained de-risked. Supplementary Fig. 6 shows scenario 1. ‘Other’ contains costs for H2 compression and decompression, trucking transportation, battery interface, Haber–Bosch process, H2 fuel cell and a ramping penalty. Excludes landlocked countries and Libya and Somalia (Methods).

Back to article page