Table 1 Design specifications of the economic statistical model.

From: Economic statistical model of the np chart for monitoring defectives

Process specifications

\({p}_{0}\)

In-control fraction nonconforming. It is calculated from the historical data examined during in-control process

Ď„

Minimum allowable in-control \({ATS}_{0}\). It is selected depending on the false alarm rate specifications

r

Inspection rate. It is estimated based on the accessibility of resources like workforce and equipment

\({\delta }_{max}\)

Maximum shift in fraction nonconforming. It is decided based on the maximum shift that the user wishes to detect

ε

Assignable cause rate of occurrence

e

Time to estimate observed data of a sample. It can be easily estimated from a field test

D

Time between detecting the out-of-control condition and removing the assignable cause

Cost specifications

b

Sampling fixed cost

c

Sampling variable cost

W

Cost of locating and resolving an assignable cause

T

False alarm examining cost

M

Cost incurred due to the increasing p shift