Table 5 Economic, operation, and security situation of SDN considering various cases.
Case | I | II | III | IV | V | VI | |
|---|---|---|---|---|---|---|---|
Economic | Energy cost ($) | 3269.2 | 2451.6 | 1824.2 | 2502.3 | 1891.3 | 1862.1 |
Security | Weak bus | 27 | 27 | 27 | 27 | 27 | 27 |
Min WSI (p.u.) | 0.735 | 0.815 | 0.878 | 0.865 | 0.918 | 0.933 | |
Operation | Energy loss (MWh) | 3.65 | 2.321 | 2.192 | 2.465 | 1.936 | 1.902 |
Maximum voltage drop (p.u.) | 0.092 | 0.051 | 0.049 | 0.049 | 0.048 | 0.047 | |
Maximum over-voltage (p.u.) | 0 | 0.034 | 0.022 | 0.024 | 0.015 | 0.013 | |
Peak load carrying capability (MW) | 3.715 | 4.967 | 5.361 | 5.284 | 5.601 | 5.624 | |