Fig. 12
From: A machine learning based EMA-DCPM algorithm for production scheduling

Verification of optimization results of total construction period objectives. (a) Initialization. (b) Change (1, 3) task status. (c) Optimization results.
From: A machine learning based EMA-DCPM algorithm for production scheduling

Verification of optimization results of total construction period objectives. (a) Initialization. (b) Change (1, 3) task status. (c) Optimization results.