Table 11 Results comparison of scenarios 1 and 2 using the MOIHHO for 69-bus network (Scenario#3).

From: A multi-objective improved horse herd optimizer based on convex lens imaging for stochastic optimization of wind energy resources in distribution networks considering reliability and uncertainty

Item/method

80*Rated Value

Rated Value

1.20*Rated Value

WT size/@site (Bus)

837/@57/0.85

1129/@63/0.87

801/@57/0.86

1092/@61/0.85

754/@57/0.82

1024/@61/0.84

Power Loss Cost (kW)

13183.39

13770.27

14156.03

Energy Not-provided (MWh/yr)

2.84

2.91

2.97

WT cost ($)

851,738.25

880,237.17

916,635.77

Minimum Voltage

0.9719

0.9711

0.9704