Table 7 Results comparison of scenarios 1 and 2 using the MOIHHO for 33-bus network.
Item/method | Deterministic (Scenario#1) | Stochastic (Scenario#2) |
|---|---|---|
WT size/@site (Bus) | 709/@13/0.90 1185/@30/0.86 | 868/@13/0.87 1042/@30/0.85 |
Power Loss Cost (kW) | 16593.47 | 17620.53 |
Energy Not-provided (MWh/yr) | 1.39 | 1.47 |
WT cost ($) | 881,764.91 | 892,434.19 |
Minimum Voltage (p.u) | 0.9796 | 0.9786 |