Table 1 Regression relations developed for Northeast India region are presented in the table.

From: Updated probabilistic seismic hazard assessment using Mwg (Das magnitude scale) to address moment magnitude (M) scale inaccuracies below 7.5: a case study from Northeast India

 

Slope along with Uncertainty

Intercept along with Uncertainty

Standard Deviation (σ )

Correlation Coefficients, Rxy

Ita

1

Err

2

Err

3

Err

1

Err

2

Err

3

Err

1

2

3

1

2

3

1.00

1.14

0.00

1.24

0.04

1.08

0.03

− 0.97

0.10

− 1.47

0.24

− 0.64

0.17

0.14

0.25

0.24

0.96

0.88

0.89

1.00

1.21

0.00

1.34

0.05

1.14

0.04

− 1.38

0.14

− 2.07

0.31

− 0.99

0.22

0.16

0.26

0.25

0.95

0.86

0.88

1.00

0.69

0.00

0.72

0.03

0.67

0.03

1.62

0.06

1.51

0.19

1.75

0.13

0.08

0.18

0.18

0.98

0.92

0.93

1.00

0.83

0.00

0.86

0.05

0.81

0.05

0.83

0.15

0.69

0.37

0.95

0.27

0.10

0.18

0.18

0.98

0.95

0.95

1.00

1.12

0.00

1.19

0.07

1.06

0.06

− 0.89

0.20

− 1.28

0.52

− 0.61

0.34

0.15

0.27

0.26

0.97

0.90

0.91

  1. The third, fourth, fifth, sixth, and seventh rows of the table represent the regression relationships for mb,ISC to Mwg, mb, NEIC to Mwg, ML to Mwg, MS,ISC to MWg, and MS,NEIC to Mwg, respectively. The header abbreviation indicates that 1 stands for GOR1, 2 stands for GOR2, 3 stands for SLR, and Err stands for Error.