Table 3 Evaluation indexes of positioning accuracy.
From: Single-base station positioning for photovoltaic power plant inspection UAVs based on PPP-B2b signal
| Â | Static | Dynamic | ||
|---|---|---|---|---|
Before correction | After correction | Before correction | After correction | |
E | 0.319 m | 0.298 m | 0.550 m | 0.496 m |
N | 0.321 m | 0.288 m | 0.537 m | 0.483 m |
U | 0.535 m | 0.471 m | 0.653 m | 0.585 m |