Table 6 System performance comparison of the cloud-based electric power enterprise design platform before and after optimization under different scenarios.

From: Optimization and benefit evaluation model of a cloud computing-based platform for power enterprises

Scenario

Metric

Before optimization

After optimization

Improvement (%)

Normal load

Average task completion time (s)

8.5

4.2

↓ 50.6%

CPU utilization (%)

55.2

76.8

↑ 39.1%

Memory utilization (%)

48.7

70.3

↑ 44.3%

High load

Average response latency (ms)

330

140

↓ 57.6%

System throughput (tasks/min)

820

1460

↑ 78.0%

Service interruptions (times/month)

4

1

↓ 75.0%

Fault Scenario

Fault recovery time (minutes)

18

6

↓ 66.7%

Task loss rate during fault (%)

5.2

1.1

↓ 78.8%

Fault-tolerant task rescheduling success rate (%)

61.4

92.6

↑ 50.8%

Cost Simulation

Monthly total power consumption (kWh)

12,000

8,200

↓ 31.7%

Labor maintenance cost (10,000 CNY/month)

13.5

6.2

↓ 54.1%

Total cost saving ratio (%)

Approx. 43.0%