Table 20 A comparison of this project with other CCUS projects in energy consumption and cost.

From: Research and design experience of a 1 million tons/year CO2 capture project in the Shengli oilfield of Qilu petrochemical

Project name

Region

Scale

(104 t·a −1)

Comprehensive energy consumption

(GJ·t−1)

CO₂ capture cost(CNY/t)

Type

Boudary Dam

Canada

100

4.00

>300

Post-Combustion capture in coal-fired power plants

Petro Nova

USA

140

3.6 ~ 4.5

>300

CO2-EOR with storage

Quest

Canada

100

3.5 ~ 4.2

>210

Tail gas from hydrogen production unit

Huaneng Shanghai Shidongkou Power Generation Co., Ltd

Shidongkou, Shanghai

12

3.50

/

Post-Combustion capture in coal-fired power plants

Anhui Conch Cement Co., Ltd. Baimashan Cement Plant

Wuhu, Anhui

5

3.40

/

Cement kiln tail gas capture

Guoneng Jinjie Power Plant 150,000 t/a Coal-Fired CO₂ Capture and Storage (CCUS) Demonstration Project

Yulin, Shaanxi

15

2.90

180–250

Post-Combustion capture in coal-fired power plants

Jiangsu Huadian Jurong Power Generation Co., Ltd

Zhenjiang, Jiangsu

1

3.20

350

Post-Combustion capture in coal-fired power plants

This project

Zibo, Shandong

100

2.65

180

low-temperature distillation