Table 1 Maximum tracking errors for different schemes on different orbits/cm.

From: Investment feasibility and optimization strategies of RFID technology in logistics field

Scheme

Straight track

Circular track

Number of experiments

Number of experiments

1

2

3

4

5

1

2

3

4

5

Scheme A*

0.726

0.886

0.858

0.867

0.709

0.892

0.774

0.819

0.831

0.715

Scheme B*

0.678

0.637

0.624

0.671

0.743

0.784

0.790

0.684

0.774

0.797

Scheme C*

0.421

0.481

0.495

0.458

0.527

0.569

0.584

0.492

0.483

0.549

Scheme 1*

0.323

0.397

0.396

0.345

0.363

0.367

0.380

0.344

0.311

0.365

Scheme 2*

0.231

0.171

0.125

0.178

0.203

0.170

0.334

0.314

0.183

0.312

  1. Note: * in the table represents p < 0.05, indicating that the difference is statistically significant.