Fig. 12
From: Optimized seismic risk mitigation in pipeline routing using a metaheuristic GIS based approach

Route length comparison between the designed and existing routes.
From: Optimized seismic risk mitigation in pipeline routing using a metaheuristic GIS based approach

Route length comparison between the designed and existing routes.