Fig. 2

Superimposed plots (left) and scatter plots (right) of predicted and actual crop coefficient magnitudes (Kc) during the validation process; in the scatter plots, dotted red lines show the 45° line (1:1; line of perfect prediction).

Superimposed plots (left) and scatter plots (right) of predicted and actual crop coefficient magnitudes (Kc) during the validation process; in the scatter plots, dotted red lines show the 45° line (1:1; line of perfect prediction).