Table 5 Contribution of each source to total forecast uncertainty.
From: Credible capacity evaluation of virtual power plants considering wind and PV uncertainties
Source of uncertainty | Contribution (%) | Variance (\(\hbox {kW}^2\)) |
|---|---|---|
Wind speed variability | 48.6 | 27.4 |
PV irradiance variability | 33.7 | 19.0 |
Load forecast deviation | 17.7 | 10.0 |