Table 9 Accuracy results of the two networks, E-RNN and FNN, in predicting polymer front arrival time for both model 1 and model 2.
Simulation | E-RNN | FNN | ||
|---|---|---|---|---|
Model 1 | Time (hr) | 237.383 | 237.092 (-0.122%) | 237.990 (+ 0.255%) |
Model 2 | Time (hr) | 180 | 203.539 (+ 13.077%) | 156.320 (-13.155%) |