Fig. 24
From: An integrated geomechanical–drill string trajectory optimization method for initial wellbore design

Engineering workflow of trajectory optimization framework in an edge–cloud collaborative drilling system.
From: An integrated geomechanical–drill string trajectory optimization method for initial wellbore design

Engineering workflow of trajectory optimization framework in an edge–cloud collaborative drilling system.