Fig. 8
From: An integrated geomechanical–drill string trajectory optimization method for initial wellbore design

B-spline-based trajectory parameterization in 3D coordinate space.
From: An integrated geomechanical–drill string trajectory optimization method for initial wellbore design

B-spline-based trajectory parameterization in 3D coordinate space.