Table 2 Comparative statistics of key metrics among schemes A/B/C.

From: An integrated geomechanical–drill string trajectory optimization method for initial wellbore design

Metric

Scheme A

(Geo-only)

Scheme B (Geo + Mech)

Scheme C

(Geo + Mech + Prob, proposed)

Well length L (m)

3120

3185

3190

Avg-DLS (°/30 m)

2.1

1.8

1.6

Max-DLS (°/30 m)

5.8

4.2

3.5

Curvature P95 (1/m)

0.032

0.027

0.021

Corridor coverage rate (ER, %)

72.5

78.3

85.6

High-risk crossing length Lrisk (m)

265

180

95

Pressure violation rate (%)

2.3

0.7

0.0

Min anti-collision distance (m)

23.5

25.1

25.3

Computational cost (s)

185

210