Fig. 8
From: Mechanical response of elevated bridge piles to adjacent deep excavation

Comparison diagram of maximum displacement at different excavation stages (Z direction). (a)Excavation stage 1, (b)Excavation stage 2, (c)Excavation stage 3, (d)Excavation stage 4, (e)Excavation stage 5, (f)Excavation stage 6.