Table 2 Main parameters under four scenarios.
Parameters | Scenario 1 | Scenario 2 | Scenario 3 | Scenario 4 |
|---|---|---|---|---|
Comprehensive operation cost/USD | 5.0052 × 106 | 5.2924 × 106 | 5.2009 × 106 | 5.3173 × 106 |
Emissions of CO2 and atmospheric pollutants/1b | 2.4527 × 105 | 2.3902 × 105 | 2.3511 × 105 | 2.2028 × 105 |
User’s comprehensive satisfaction with electricity | 83.01% | 86.97% | 91.89% | 97.96% |
Total thermal power output/MW | 28,852.4 | 24,795.3 | 23,882.3 | 22,336.3 |
Variance of thermal unit output | 72,582.55 | 28,173.01 | 10,006.52 | 7663.55 |
Variance of optimized load | 56,574.73 | 33,445.76 | 21,638.55 | 13,937.80 |
Load shedding capacity/(MW·h) | 1530.37 | 361.36 | 262.89 | 49.103 |
Wind and PV abandonment/(MW·h) | 916.71 | 102.09 | 181.61 | 22.77 |