Table 2 Main parameters under four scenarios.

From: Robust fuzzy dynamic integrated environmental-economic-social scheduling considering demand response and user’s satisfaction with electricity under multiple uncertainties

Parameters

Scenario 1

Scenario 2

Scenario 3

Scenario 4

Comprehensive operation cost/USD

5.0052 × 106

5.2924 × 106

5.2009 × 106

5.3173 × 106

Emissions of CO2 and atmospheric pollutants/1b

2.4527 × 105

2.3902 × 105

2.3511 × 105

2.2028 × 105

User’s comprehensive satisfaction with electricity

83.01%

86.97%

91.89%

97.96%

Total thermal power output/MW

28,852.4

24,795.3

23,882.3

22,336.3

Variance of thermal unit output

72,582.55

28,173.01

10,006.52

7663.55

Variance of optimized load

56,574.73

33,445.76

21,638.55

13,937.80

Load shedding capacity/(MW·h)

1530.37

361.36

262.89

49.103

Wind and PV abandonment/(MW·h)

916.71

102.09

181.61

22.77