Table 5 Comparison of performance metrics.
From: Research on the dynamic performance and motion control methods of deep-sea human occupied vehicles
Control scheme | Convergence time | Tracking error averages |
|---|---|---|
ISMC | 14 | 0.0223 |
AISMC | 2 | 0.0026 |
From: Research on the dynamic performance and motion control methods of deep-sea human occupied vehicles
Control scheme | Convergence time | Tracking error averages |
|---|---|---|
ISMC | 14 | 0.0223 |
AISMC | 2 | 0.0026 |