Table 2 Risk level of hazard indicators.

From: Risk assessment of land subsidence in Shanghai municipality based on AHP and EWM

Indicators

Very low

Low

Medium

High

Very high

Elevation (m)

< 2

2–8

8–14

14–20

>20

Land subsidence rate (mm/a)

< 3

3–6

6–9

9–12

>12

GW extraction intensity (104m3/km2)

< 20

20–40

40–60

60–80

>80