Fig. 10

Horizontal displacement cloud map of walls at the tunnel’s terminal end with different thicknesses. (a) The blocking wall is located at the left end of the tunnel; (b) The blocking wall is away from the main hole.

Horizontal displacement cloud map of walls at the tunnel’s terminal end with different thicknesses. (a) The blocking wall is located at the left end of the tunnel; (b) The blocking wall is away from the main hole.