Table 2 Comparison of different intraday optimal dispatch strategy.
Optimal dispatch strategy | Intraday operation cost/Â¥ | Solution time of a single control time/s |
|---|---|---|
SPC | 685.23 | 6.96 |
MPC | 716.07 | 0.74 |
Optimal dispatch strategy | Intraday operation cost/Â¥ | Solution time of a single control time/s |
|---|---|---|
SPC | 685.23 | 6.96 |
MPC | 716.07 | 0.74 |