Table 6 The maximum horizontal displacement of the retaining pile in each construction stage.

From: Fusing multiple source data for foundation excavation risk assessment based on cloud model and Dempster Shafer evidence theory

Construction stage

Maximum horizontal displacement (mm)

3

Excavate the first soil layer

2.51

4

Erect the first support

3.09

5

Excavate the second soil layer

3.88

6

Erect the second support

4.76

7

Excavate the third soil layer

5.63

8

Erect the third support

6.82

9

Excavate the fourth soil layer

8.89

10

Erect the fourth support

8.35

11

Excavate the fifth soil layer

8.69