Table 7 The maximum bottom uplift in each construction stage.

From: Fusing multiple source data for foundation excavation risk assessment based on cloud model and Dempster Shafer evidence theory

Construction stage

Bottom uplift (mm)

3

Excavate the first soil layer

4.98

4

Erect the first support

6.07

5

Excavate the second soil layer

8.41

6

Erect the second support

9.86

7

Excavate the third soil layer

12.31

8

Erect the third support

15.02

9

Excavate the fourth soil layer

20.59

10

Erect the fourth support

22.86

11

Excavate the fifth soil layer

24.32