Table 6 Comparison of average time for 30 experiments in three simulation environments.
From: A UAV path planning algorithm for bridge construction safety inspection in complex terrain
Algorithms | Horn-shaped overpass scene | Mountain viaduct scene | Non-intertwined overpass scene |
|---|---|---|---|
CSGLSO | 16.924 | 12.617 | 15.445 |
SO | 16.715 | 10.568 | 13.786 |
HSOA | 18.118 | 13.547 | 16.179 |
ISSA | 15.201 | 9.717 | 12.284 |
ECS | 16.324 | 10.252 | 13.063 |