Table 1 Parameters controlling the faults seals.

From: Evaluation of lateral sealing capability of fault-controlled gas storage at different periods

Well No.

Gas cap altitude /m

Gas cap bottom /m

Gas column height /m

High point of structure /m

GWC /m

Maximum air column height /m

L-1

−1246.8

−1260.4

13.6

−1195.5

−1263

67.5

L-2

−1213

−1260.3

57.3

L-3

−1207

−1260.9

53.9

L-4

−1206

−1261.3

55.3

L-5

−1218

−1263

45

L-6

−1215

−1262.2

47.2

L-7

−1223

−1259.5

36.5