Table 5 LCOC and cost component breakdown at representative Nodes.
Cost component | Scenario A | Scenario B | Scenario C |
|---|---|---|---|
CAPEX Contribution (%) | 37 | 44 | 48 |
OPEX Contribution (%) | 63 | 56 | 52 |
Solar Savings (₹/kWh) | 0 | 0.68 | 1.14 |
LCOC (₹/kWh) | 19.6 | 18.3 | 16.4 |