Table 4 The system outputs at different air velocity through February and March 2025.

From: Performance analysis of a solar desalination system operated by humidification–dehumidification technique

Week No

Date

vair (m/s)

Average weekly productivity (kg/day)

GORoverall

RR (%)

MR

Week-1

15–20/Feb.

13.2

11.53

0.881

0.08

0.346

Week-2

22–27/Feb.

12.6

9.85

0.839

0.069

0.363

Week-3

1–6/Mar.

12.1

7.41

0.785

0.052

0.378

Week-4

8–13/Mar.

11.8

6.21

0.7

0.043

0.387

Week-5

15–20/Mar.

10.8

4.87

0.6

0.034

0.423

Week-6

22–27/Mar.

10.2

2.92

0.385

0.02

0.448