Table 18 Sensitivity break even points.

From: Integrated ATC enhancement and load growth forecasting via WOA-based optimal DSTATCOM placement

Parameter

Base value

Break even value

VMW

25,000 $/MW

13,982 $/MW

ATC Gain

40 MW

22.37 MW

Capital Cost

5,000,000 $

9,327,344 $