Table 5 The estimate results of structural efficiencies.
From: Measuring communities’ efficiencies within the global tourism network
Parameter | Est. value | Std. error | t | P | 95% confidence interval | |
|---|---|---|---|---|---|---|
Lower limit | Upper limit | |||||
Intercept | 1.815168 | 0.359676 | 5.05 | 0 | 1.075844 | 2.554491 |
GP | 0.220721 | 0.082434 | 2.68 | 0.013** | 0.0512758 | 0.3901662 |
TP | −2.19E−09 | 1.78E−09 | −1.23 | 0.23 | −5.85E−09 | 1.48E−09 |
APC | −2.12E−08 | 1.01E−08 | −2.1 | 0.046** | −4.19E−08 | −4.15E−10 |
EGS | 0.0270393 | 0.012988 | 2.08 | 0.047** | 0.0003427 | 0.053736 |
GDP | 5.64E−13 | 6.30E−13 | 0.89 | 0.379 | −7.32E−13 | 1.86E−12 |
PVPE | −6.131509 | 3.427843 | −1.79 | 0.085* | −13.17754 | 0.9145234 |
WC | −0.3201686 | 0.53212 | −0.6 | 0.553 | −1.413956 | 0.7736188 |
WH | −0.2143648 | 0.136086 | −1.58 | 0.127 | −0.4940945 | 0.0653649 |
ICH | −0.0666565 | 0.081644 | −0.82 | 0.422 | −0.2344774 | 0.1011643 |
pGDP | −8.48E−06 | 2.33E−05 | −0.36 | 0.718 | −0.0000563 | 0.0000393 |