Fig. 7: The grid load at the shared bus depot under different scenarios. | npj Sustainable Mobility and Transport

Fig. 7: The grid load at the shared bus depot under different scenarios.

From: Optimizing bus charging infrastructure by incorporating private car charging demands and uncertain solar photovoltaic generation

Fig. 7

We show the grid load over a day, comparing scenarios without and with solar PV integration. The orange line represents grid load without solar PV, showing higher peaks, particularly around noon and early afternoon. The beige line, indicating grid load with integrated solar PV, demonstrates significant reductions during peak times and overall smoother load fluctuations.