Abstract
The automotive industry serves as a crucial support system for the economies of industrialized nations in their pursuit of international market competitiveness. Despite this industry's importance, most developing countries face the challenge of acquiring a reasonable economic position at the global level in the automotive sector for various reasons. The most salient reasons include inconsistent government policies, multiple taxes, investor insecurity, political instability, and currency devaluation. Identifying risks is crucial for a new entrant in the already-established automotive industry. The researchers have used multiple (qualitative and quantitative) techniques to identify and prioritize risks in setting up manufacturing plants. The efforts to tackle these identified risks are undertaken at the domestic and government levels to smoothen the establishment of industry. The risks are first identified, in the current study, by reviewing the previous literature and conducting interviews of the various stakeholders (automotive dealers, managers, and customers). Then this study uses Monte Carlo simulation (MCS) approach and develops a risk exposure (high, medium, or low) matrix for the automotive industry of Pakistan. The findings reveal that the depreciation of local currency against the foreign exchange, oligopoly nature of competition, and low market acceptability of new entrants due to their products' image are the most critical risks the automobile industry faces. These findings will help automotive research institutes in developing national policies that specifically aim to support new players in the automotive industry, particularly in addressing high-priority hazards. The results may also provide valuable insights for new participants seeking to identify and address the key challenges in the Pakistani automotive industry before entering it.
Similar content being viewed by others
Introduction
Automotive industry is one of the most important industries that draws domestic and foreign capital to help boost the country's gross domestic production (GDP). Developing countries generally lack advanced manufacturing technologies and rely on assembling vehicles instead of manufacturing operations. This results in overall slow growth and greater dependency on imported products1. Simultaneously, venturing into assembling business by the new entrants in developing countries is also marred with many risks2. The organizations can only plan their risk mitigation strategies once all the risks are recognized and categorized according to their probability and impact3. In a developing country with emphasis on automobile assembly operations, risks are different than the countries with manufacturing operations intensive automotive industry. The companies generally utilize outdated technology, thus lacking precision equipment's production capacity, resulting in a long production time and cost. The automotive industry of Pakistan has seen highs and lows over the past couple of decades but overall, the sector has suffered due to poor policies and negligence by decision makers1,4. Pakistan's automotive sector has two/three wheelers, passenger vehicles (including automobiles, jeeps, and station wagons), commercial vehicles (trucks and buses), and tractors. Being the fifth largest population in the world, the country is the hot spot for new domestic and foreign automotive companies5. Currently, over 25 Pakistani companies collaborate technologically with Japanese and Korean manufacturers such as Suzuki, Honda, Toyota, Hino, Hyundai, and Mazda with overall 95% market share and domination by the Three-big Japanese companies in Pakistani automotive sector (as shown in Table 1). The sector relies heavily on the imports for assembly operations. The strong presence of Japanese companies has managed to curtail the share of new entrants in the country.
The local companies in collaboration with Chinese automotive companies have made considerable efforts to enter in the market because of their low cost offering suitable for the local customers6. Therefore, these new entrants need to gauge risks for making strategies for the successful assembly and launch of their products. The identification of risks for the new entrants (other than Three-big automobile manufacturers) with 5% market share in Pakistani automotive sector (as shown in Table 2 such as joint ventures, merger, and acquisitions or venture capitalists) will certainly help all stakeholders willing to invest in automotive industry after implementation of Pakistan Automobile Development Policy (ADP) 2016–20217.
Despite concerted efforts by domestic and international automobile manufacturers, a significant majority have not successfully introduced cost-effective vehicles within the Pakistani market. A primary contributor to these shortcomings has been identified as a lack of in-depth understanding and knowledge concerning the local market dynamics and consumer preferences. A notable deficiency exists in these companies' grasp of the risks inherent to the local market context, leading to costly misjudgements. This research employs expert evaluations and the MCS technique to assess the risks confronting new entrants in the automotive sector. These risks are categorized and quantified based on exposure zones (high, medium, or low). The methodology adopted in this study offers a comprehensive risk identification framework, marking a pioneering effort within the context of the automotive industry in a developing country.
The subsequent sections of the paper detail the development of the proposed framework followed by presenting the results of an experimental evaluation for its efficacy.
Literature review
Global automotive industry
Throughout history, car production has significantly impacted early industrialised nations' economic growth. This industry has introduced advancements in technology and workplace structure that have improved productivity and have been adopted by other sectors. The global automobile sector is known for its intricate and comprehensive integration of global, regional, national, and local value chains, resulting in a unique pattern of global integration. The industry is continuously evolving, as evidenced by car-to-external object communication technology developments, car sharing, and the transition to electric automobiles and autonomous driving. The industry is crucial in driving global economic growth, fostering technical advancements, and influencing employment rates. Germany has remained the leading vehicle exporter for almost a decade, while China holds the top in automobile production. The United States, Japan, and Germany rank below China in car production. The sector's trajectory is influenced by the growing manufacturing of electric and hybrid vehicles, progress in self-driving technology, the growth of car sharing services, and rapid breakthroughs in automobile-related software8,9. As a result of the industry's economic multiplier effects and high labor productivity, contemporary emerging economies, including India and Vietnam view the establishment of an automotive sector as a crucial industrialization milestone10. Encouraging the usage of new energy vehicles (NEVs) in big cities is not only a key area of priority for the government to encourage the transformation of the automobile industry, but it is also a crucial step in reducing environmental pollution11, unlike Pakistan where people still prefer conventional/combustion vehicles due to many reasons12. The state typically has a leading role in promoting efforts to establish the industry in new countries13.
Risk identification tools and techniques
Risk identification is the first step in the risk assessment process14,15. Automobile manufacturing industry needs to identify the risks so appropriate strategies may be developed for tackling them16. Risk assessment techniques include both qualitative and quantitative methods (Table 3) to identify and describe the risks associated with a decision problem and analyse the potential impacts of the risk17.
Risk categorizing techniques prevalent in the academia and industry
Generally, processes of qualitative and quantitative risk analysis can be used independently or together as shown in Table 4. Deliberations of time and budget disposal and the need for qualitative or quantitative reports about risk and impacts determine which methods are better to use17.
A. del Cano and M. Pillar de la Cruz (2002) also divided risk analysis techniques into qualitative and quantitative18 as shown in Table 5.
Comparison of risk analysis tools and techniques with their properties such as their adaptation to risk matrices, assessment of risk exposure, probabilistic relative importance of risks, prioritization of risks and categorization of risks into multiple exposure zones is tabulated in Table 6.
Risk simulation techniques and why Monte Carlo is best for such studies?
It is a stochastic simulation method consists of the stages in sequence as: (i) identification of criterion and relevant variables, (ii) allocation of probability for relevant variables, (iii) determination of correlation coefficient among relevant variables, (iv) and simulation execution and results analysis. The MCS method is a stochastic simulation method used in the quantitative risk analysis. It has a wide range of application in various fields: numerical mathematics, physical chemistry, statistical physics, computer graphics, finance etc33. Strengths, weaknesses, opportunities, and threats (SWOT) analysis of MCS in comparison with some other multi criteria decision making (MCDM) tools and techniques are tabulated in Table 7.
There is a study by Garg et al., in which microphone free-field calibrations in the frequency range from 125 Hz to 20 kHz were investigated by utilizing a comparison of Guide to Expression of Uncertainty in Measurement and MCS approaches. They used an Excel spreadsheet to implement this and used a mixture of Gaussian and rectangular probability density functions to model uncertainty inputs. The uncertainty results obtained by both these methods were very close at two frequencies when higher-order nonlinear and correlation effects were absent. Rachakonda et al. concluded that the MCS approach may be preferred to get a convenient method for calibration measurement capability assessments for calibration and industrial measurement laboratories37,38.
MCS operationalizes a new process for prioritizing sustainability-related project risks using risk matrix data. It retains conflicting assessments of experts about the probability and impact ratings of sustainability-related risks and establishes the ranking of risks relative to the decision-maker's risk appetite. The main merit of the proposed process is its compatibility with the conventional risk matrix-based approaches since risk matrix data are used to operationalize the process and the decision-maker's risk appetite is established across risk exposure zones within a risk matrix. The compatibility of new risk assessment techniques with the existing practices is essential since "… it seems that they (practitioners) prefer to use the simple quantitative tools to perform a quantitative risk analysis. Such a conclusion might need to be always considered when introducing any alternative to the existing tools"39.
The risks in automotive sector of Pakistan highlighted in this study are based on literature review as well as semi-structured interviews by the main stake holders of the industry. So, it is good blend of both previous work and current situation in Pakistan to assess the risks for new entrants in the automobile sector. MCS provides the solution to prioritize those risks and uncertainties to make better decision making by the new entrants in such a market of a developing country. According to Akbar et al., MCS is utilized due to its speedy calculations and probability distributions (iterations in thousands) to get the results40 in such a scenario.
Case of Pakistan automotive industry
In Pakistan, vehicle production data (from 1974 to 75 to the present) shows that the industry performed its best in the 1970s and then again in the 2000s. Performance plunged in the 1980s and fell even worse in the 1990s, to less than 4%41. Pakistan's automobile sector has always failed to fulfil its full potential except for the motorcycle manufacturing industry. Most automobile assemblers use technology and provide minimal features compared to cars on the global market. Domestic consumers cannot access the most advanced technology and automobile safety standards. In developing countries like Pakistan, the automobile sector is facing challenges in growing under its stressed economy. For the survival and advancement of vehicle sector, the current era of globalisation necessitates fashionable models, enhanced fuel efficiency, cost reduction, and enhancement in consumer comfort. This competitive period necessitates more attention to safety and the environment. For any developing countries, auto industry is one of its emerging industries. Vehicle manufacturers globally putting significant efforts to spend their capital on the development and automation of assembly plants to find smart mechanism bringing value to their investment and contribution in the sector. According to the ADP 2016–2021 by Economic Coordination Committee (ECC) of Pakistan, a new manufacturer requires special treatment and better incentives to promote and initiate its product, create its reputation, form a network for expanded services, and establish a base for part manufacturers.
This rationalizes the formulation of the following two important research questions answered through this research.
RQ1: What risks are associated with the new entrants in the Pakistani automobile Industry?
RQ2: What are the significant risks (that lay in high exposure zone) for the new entrants in the automobile sector of Pakistan?
Research methodology
A mixed research approach is used to answer the research questions. In this research, interviews were conducted using a qualitative method while a quantitative questionnaire (Annexure-'A'), using a 5-point Likert scale, was used to acquire the probability and impact factor ratings for the identified risks. These ratings were then used to calculate the total risk exposure of the individual risk.
Thirteen experts/participants were approached to identify the potential risks through semi-segmented interviews (Table 8). After the initial interviews and identification of risks, 30 experts from the relevant sector were approached to respond to the qualitative questionnaire (Annexure-'A'), thus determining the probability and impact of risk factors. Chief Executive Officers (CEOs)/heads of departments (HoDs), purchasing managers, and operational managers from the company authorized 2S/3S dealerships of the automotive industry comprised the experts.
The interview technique enabled for the deeper insight provided by the participants in the relevant industry to be captured, and the findings in a study go beyond the need to gather quantitative data. Semi-structured interview approach was chosen at this stage based on the research objectives and a literature evaluation. The methodology was compared to similar earlier studies by considering their respective research techniques and tools. Similarly, a list of conducted interviews and survey questionnaire distribution details was summarized to aid in identifying risks for new entrants in the automobile sector. The interview questions were open-ended and not only limited to research-related information.
There are 29 risks (in total) out of which 12 are identified through a literature review (Table 9) whereas 17 are identified through semi-structured interviews conducted in the automotive industry of Pakistan (Table 10).
This research used a mixed-method approach, a blend of qualitative and quantitative methodologies as per Morgan's (1998) priority sequence model50,51. Firstly, researchers began with a qualitative study by conducting semi-structured interviews to identify risks based on interviewees' industrial experience. Then, a quantitative questionnaire (Annexure-'A') with 29 items (risks) based on a 5-point Likert scale was distributed in the relevant industry, asking to score probability and impact for each risk. This method was used to decide based on the discrete values of each risk, which enables precise dynamic simulations52.
Risk exposure is found out by multiplying the risk probability and risk impact rating for individual risks as shown in Eq. (1) 3 below:
where REi is the risk exposure, PRi is the probability of risk, and IRi is the impact of risk.
for i = 1, 2, 3, …, n
During MCS, the probabilities and impact factor ratings of the identified risks were simulated and modelled by using @Risk version 8.2 (a Microsoft Excel add-in by Palisade).
Data analysis
A total of twenty-nine risks (R1, R2, …, R29) were identified in the study from the literature review/published interviews worldwide and by conducting the semi-structured interviews, and their risk exposure and risk signature values are shown in Table 11. The risks were classified into three risk exposure zones: i.e., Low risk exposure, medium risk exposure, and high-risk exposure. The risks which have an exposure value below 16 lay in low-risk exposure zones, between 16 and 20 lay in medium risk exposure zone, and between 20 and 25 lay in high-risk exposure zone.
Conventional risk prioritization
The conventional risk prioritization matrix is a system in which the risk exposure is calculated by multiplying the individual risk priority and impact rating, and the risk exposure values determine the severity of the individual risk factors. The graph can be plotted against the risk exposure values and severity of individual risks can be identified, and the mean value is calculated from the given data set to measure the total risk exposure. This system of measuring risks has certain limitations as it can only rely on the data collected without any simulations and simply plots the graph of the mean values of risk exposure of individual risks.
From data of this study, when plotted against the mean values using the conventional risk prioritization approach, the data shows that only one risk R2 (Rupee devaluation against foreign currencies) touches the threshold of high-risk exposure zone, and no other risk lay in high-risk exposure zone. Four risks lay in medium risk exposure zone and twenty-four in low-risk exposure zone, as shown in Fig. 1. From the graph, it can be concluded that this conventional method for risk prioritization is not enough to accurately and precisely measuring the exact risk exposure value. Thus, another technique should be applied to measure the risk exposure value that is accurate and precise.
Graph of risk exposures using mean values (conventional approach).
MCS based risk exposure prioritization
As discussed above, the conventional approach to accurately measure the risk exposure value is not well observed and does not provide a clear picture of the exact risk exposure. As discussed earlier, the MCS has been used by using @Risk version 8.2 (a Microsoft Excel add-in by Palisade). The data were then transferred into an excel sheet and MCS were run on the probability ratings, impact ratings and the total risk exposures of individual risks. There were 1300 simulations after that the convergence have been achieved.
After the MCS, the results show that five risks lay in high-risk exposure zone, nine in medium risk exposure zone and the rest in low-risk exposure zone as shown in Fig. 2. These results show a significant difference in the conventional risk exposure matrix using means and MCS based risk exposure prioritization matrix.
Graph of risk exposures based on MCS.
The risk exposure profiles were used to identify which risks lay in high, medium, and low exposure zones as shown in Table 12. Five risks such as R2 (Rupee devaluation against foreign currencies), R3 (High/Multiple Taxation), R6 (Low vendor availability), R8 (Oligopoly), and R28 (Bad image of Chinese products) lays in high-risk exposure zones, which means these risks are the most critical risks faced by the automobile industry of Pakistan (especially new entrants).
Results and discussion
Based upon the responses by the subject matter experts, mean and standard deviation values along with their probability distribution of probability rating as well as impact rating for every identified risk (R1, R2, …, R29) is shown in Table 13. According to Barreras, the most common number for simulation repetitions is 1000 iterations33,53 likewise authors did with MCS for all risks (R1, R2, …, R29), calculated by @Risk version 8.2 (a Microsoft Excel add-in by Palisade), is considered the true values for further assessment of the risks' prioritization.
It can be observed from reviewing the results from the conventional risk prioritization approach and using MCS based risk prioritization approach that both have significant difference in results. It is observed that by using conventional approach and plotting the graph against mean values of risk exposure, that only one risk R9 (Rupee devaluation against foreign currencies) lays in high-risk exposure zone and no other risk lays in high-risk exposure zone, whereas the results from the MCS shows that five risks lay in high exposure zone.
Five risks i.e., R2 (Rupee devaluation against foreign currencies), R3 (High/Multiple Taxation), R6 (Low vendor availability), R8 (Oligopoly), and R28 (Bad image of Chinese products) that were not seemed to be of critical nature using conventional approach but found as critical by the MCS as evident in Fig. 3. Rupee devaluation as compared to US$ and always behaving inconsistent since few years in the country plays a vital role to attract/detract foreign investment, also multiple taxation costing raw material import by the government of Pakistan discouraged potential manufacturers to invest here. Nine risks such as R4 (High production cost of locally assembled vehicles compared to other markets), R5 (No local manufacturing), R9 (Lack of skilled manpower), R13 (Political instability), R14 (Political influence), R15 (No finance and stock audit), R16 (No export policy), R21 (High cost of raw materials), and R25 (Shortage of electronic chips used in engine control units) are found as medium risk exposure zones by MCS-based results. High utilities rates contribute high production cost in Pakistan as a challenge for investors to meet their production expectations. Due to economic situation in the country, brain-drain is damaging the presence of skilled manpower, leaving behind unskilled manpower. Political instability in Pakistan has always been a debate by foreign OEMs prior to their investment in the country.
Comparison between conventional approach and MCS results in automotive industry of Pakistan.
By using the conventional approach, it is observed that 24 risks lay in low-risk exposure zone, whereas MCS-based results show that 15 risks in low-risk exposure zone.
Conclusion
This research aims to outline and classify risks into high, medium, and low exposure categories, thereby providing a framework for guidance to new entrants within the automotive sector in Pakistan. The study employs the MCS methodology to assess and quantify the likelihood of risks and identify factors that could potentially influence the automotive industry in a developing country context. By leveraging statistical sampling techniques, this method facilitates the quantification of risk and the forecasting of possible project outcomes, enabling the determination of risk probabilities. By acquiring insights regarding potential hazards and their respective exposure levels, organizations are equipped to enhance the efficiency of resource allocation. Furthermore, the applicability of this method extends beyond the automotive industry, offering potential benefits to other sectors characterized by similar operational dynamics.
The study also undertakes a comparative analysis between the conventional risk matrix-based rating methodology and the MCS-based approach within the context of risk assessment. These methodologies exhibit significant disparities in the identification and evaluation of primary hazards. For instance, when employing the average value traditional risk rating system, certain risks such as inadequate vendor availability, elevated or multiple taxation levels, market oligopoly, and the negative perception of Chinese automobile manufacturers were not deemed critical. Conversely, the application of the proposed MCS-based method identified these risks as paramount hazards. Such differences underscore the importance of adopting a comprehensive and systematic methodology to model and analyze risk exposure in the automotive industry. Moreover, the proposed approach is broadly applicable for assessing risk exposure across various risks associated with the manufacturing sector The preemptive understanding and mitigation of potential hazards, in the context of investment within any given sector, are imperative for decision-makers aiming to navigate challenges effectively. This proactive risk management is deemed fundamental for the sustainability of a business. In order to maintain a competitive edge, organizations are required to thoroughly assess prospective risks in advance, thereby determining which risks are within their tolerance threshold and which are not. Such strategic risk assessment and decision-making processes are critical for ensuring a company's long-term viability and success in a dynamic and uncertain market environment.
In developing countries, almost every industry is facing issues for investment opportunities. The study's findings have major benefits for all automotive manufacturers and government agencies of those underdeveloped nations. It serves the automotive manufacturers through which they would be able to prioritize their investment opportunities, such as for the government policy-making agencies, in such a way that the model is useful in picking out better alternatives to ease the business practices for the automobile manufacturers by their own risk setting and preferences. The study's findings show that the most critical risks of the automobile industry that should be considered are currency devaluation, low vendor availability, high taxation, supply and demand issue and bad repute of Chinese manufacturers. The technique employed can aid researchers to understand better how various risks can impact new entrants' investment decisions. With this model, practitioners can prioritize and categorize risks.
Managerial implications
This study presents a new framework, based on the MCS method, that provides engineering managers with an improved strategy for prioritizing risks. Conventional risk assessment methods have shown inadequacies, especially in their capacity to identify and analyze potential significant threats precisely. The suggested method addresses these issues by gathering substantial information from key individuals. This ensures that the risk prioritization matrix is created thoroughly and relies on agreement among all parties involved. This comprehensive approach enables a more precise identification of crucial hazards and improves the managerial process of evaluating and handling risks.
Crucially, for the model to be effective, it is necessary to obtain comprehensive probability and impact evaluations for each risk from experts in the field. Thorough evaluations like this help create customized plans to reduce risks, enabling firms to allocate resources effectively based on their specific risk preferences. Furthermore, due to the ever-changing nature of risk factors, it is necessary to regularly update the risk assessment to maintain the prioritising matrix's relevance.
The suggested risk identification and categorization framework is highly versatile, having the potential to be applied in a wide range of sectors and projects. Future study should investigate comparison analyses to determine the effectiveness of this model compared to traditional risk assessment methodologies. This approach adds to the wider academic discussion on risk management and offers practical and actionable insights for organizational leaders who want to negotiate the complexities of risk in a constantly changing business environment.
Future directions
The suggested approach concentrates solely on the risk assessment step, with no consideration given to evaluating various risk mitigation measures. Some more advanced methods (like ordered weighted averaging (OWA), and Decision making trial and evaluation laboratory (DEMATEL) analysis etc.) can be adopted for this study by utilizing their strengths to compare the results and findings. Allocation of resources to risks using the normalized criticality index can be done to mitigate them. This study uses the negative connotation of risk, dismissing the upward potential of risk as an opportunity. Individual hazards are assumed to be independent elements, which appears to be a widely accepted simplification of the real-world problem of risk interdependence. Individual hazards are given discrete probability distributions rather than continuous ones. This research might be developed along several paths of investigation. The suggested approach may be expanded to include evaluating prospective risk mitigation solutions across multiple hazards. To describe positive and negative correlations across numerous hazards, both positive and negative connotations of risk might be considered. The suggested approach may be expanded to account for interdependence among individual risks affecting social, environmental, and economic aspects of the sustainability of any sector. Expert and risk matrices data can be turned into continuous distributions. Moreover, this study only incorporates passenger cars and does not account for trucks, buses, 2 / 3 wheelers, or tractors, which are also major contributing pillars of the automobile industry; future studies may incorporate these sectors while researching the automobile industry.
Data availability
The datasets used and/or analysed during the current study available from the corresponding author on reasonable request.
References
Haq, I. U., Rashid, A., Ahmed, S. Z. The role of automobile sector in global business: Case of Pakistan. Pak. J. Int. Aff. 4(2) (2021).
Mora-Monge, C. A., González, M. E., Quesada, G. & Subba Rao, S. A study of AMT in North America: A comparison between developed and developing countries. J. Manuf. Technol. Manag. 19(7), 812–829. https://doi.org/10.1108/17410380810898769 (2008).
Qazi, A., Dikmen, I. From risk matrices to risk networks in construction projects. IEEE Trans. Eng. Manag. 1–12 (2019). https://doi.org/10.1109/TEM.2019.2907787.
Iqbal, A., Qadir, U., Siddique, O. Analysis of non-tariff measure in automotive sector of Pakistan. In Pakistan Institute of Development Economics (PIDE) (2020).
Bari, F., Mukhtar, N. Regional Competitiveness Studies: Research Study on the Auto Sector, Institute of Development and Economic Alternatives (The World Bank, 2016).
Asghar, M. M. Green supply chain management and organizational performance in automotive industry: A case study from Pakistan. South Asian J. Oper. Logist. 2(2), 18–40 (2023).
Engineering Development Board. Ministry of Industries & Production (2016).
Shakeel, U. Electric vehicle development in Pakistan: Predicting consumer purchase intention. Clean. Responsib. Consum. 5, 100065. https://doi.org/10.1016/j.clrc.2022.100065 (2022).
Sturgeon, T. J., Memedovic, O., Biesebroeck, J. V. & Gereffi, G. Globalisation of the automotive industry: Main features and trends. Int. J. Technol. Learn. Innov. Dev. 2(1/2), 7–24. https://doi.org/10.1504/IJTLID.2009.021954 (2009).
Kumar, M. Forging ahead or stagnating?: An analysis of indian automotive industry. In The Global Automotive Industry, 1st edn. 127–137 (Wiley, 2015) https://doi.org/10.1002/9781118802366.ch11.
Tang, L. & Liang, X. Optimal production and pricing strategies of automobile manufacturers in big cities under subsidy policy and dual-credit policy. Clim. Change Environ. Sustain. https://doi.org/10.3390/systems11010040 (2023).
Babar, A. H. K. & Ali, Y. Enhancement of electric vehicles’ market competitiveness using fuzzy quality function deployment. Technol. Forecast. Soc. Change. 167, 120738. https://doi.org/10.1016/j.techfore.2021.120738 (2021).
Wells, P. Sustainable business models and the automotive industry: A commentary. IIMB Manag. Rev. 25(4), 228–239. https://doi.org/10.1016/j.iimb.2013.07.001 (2013).
International Organization of Standards, ISO 31000:2018, Risk management—Guidelines, ISO (2018).
IEC, ISO 31010:2019 Risk management—Risk assessment techniques, ISO (2019).
Schuett, J. et al. Towards best practices in AGI safety and governance. Surv. Expert Opin. https://doi.org/10.48550/arXiv.2305.07153 (2023).
Dinu, A.-M. Tools and techniques for risk identification and assessment. Knowl. Horiz. Econ. 7(2), 139–141 (2015).
Caño, A. D. & Cruz, M. P. D. L. Integrated methodology for project risk management. J. Construct. Eng. Manag. 128, 6. https://doi.org/10.1061/(ASCE)0733-9364(2002)128:6(473) (2002).
Adedokun, O., Ogunsemi, D., Aje, I., Awodele, O. & Dairo, D. Evaluation of qualitative risk analysis techniques in selected large construction companies in Nigeria. J. Facil. Manag. 11(2), 123–135. https://doi.org/10.1108/14725961311314615 (2013).
Sadat, S. A., Fini, M. V., Hashemi-Dezaki, H. & Nazififard, M. Barrier analysis of solar PV energy development in the context of Iran using fuzzy AHP-TOPSIS method. Sustain. Energy Technol. Assess. 47, 101549. https://doi.org/10.1016/j.seta.2021.101549 (2021).
Bathrinath, S. et al. Modeling sustainability risks in sugar industry using AHP-BWM. Mater. Today Proc. 50(5), 1397–1404. https://doi.org/10.1016/j.matpr.2021.08.324 (2022).
Hong, E.-S., Lee, I.-M., Shin, H.-S., Nam, S.-W. & Kong, J.-S. Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM. Tunn. Undergr. Space Technol. 24(3), 269–277. https://doi.org/10.1016/j.tust.2008.09.004 (2009).
Koulinas, G., Marhavilas, P., Demesouka, O., Vavatsikos, A. & Koulouriotis, D. Risk analysis and assessment in the worksites using the fuzzy-analytical hierarchy process and a quantitative technique—A case study for the Greek construction sector. Saf. Sci. 112, 96–104. https://doi.org/10.1016/j.ssci.2018.10.017 (2019).
Bathrinath, S., Bhalaji, R. & Saravanasankar, S. Risk analysis in textile industries using AHP-TOPSIS. Mater. Today Proc. 45(2), 1257–1263. https://doi.org/10.1016/j.matpr.2020.04.722 (2021).
Moktadir, M. A. et al. Analysis of risk factors in sustainable supply chain management in an emerging economy of leather industry. J. Clean. Prod. 283, 124641. https://doi.org/10.1016/j.jclepro.2020.124641 (2021).
Davis, A., Javernick-Will, A. & Cook, S. M. The use of qualitative comparative analysis to identify pathways to successful and failed sanitation systems. Sci. Total Environ. 663, 507–517. https://doi.org/10.1016/j.scitotenv.2019.01.291 (2019).
Bakioglu, G. & Atahan, A. O. AHP integrated TOPSIS and VIKOR methods with Pythagorean fuzzy sets to prioritize risks in self-driving vehicles. Appl. Soft Comput. 99, 106948. https://doi.org/10.1016/j.asoc.2020.106948 (2021).
Guan, L., Abbasi, A. & Ryan, M. J. Analyzing green building project risk interdependencies using interpretive structural modeling. J. Clean. Prod. 256, 120372. https://doi.org/10.1016/j.jclepro.2020.120372 (2020).
Ribas, J. R., Arce, M. E., Sohler, F. A. & Suárez-García, A. Multi-criteria risk assessment: Case study of a large hydroelectric project. J. Clean. Prod. 227, 237–247. https://doi.org/10.1016/j.jclepro.2019.04.043 (2019).
Wu, P. et al. Perceptions towards risks involved in off-site construction in the integrated design & construction project delivery. J. Clean. Prod. 213, 899–914. https://doi.org/10.1016/j.jclepro.2018.12.226 (2019).
Macharis, C., Springael, J., De Brucker, K. & Verbeke, A. PROMETHEE and AHP: The design of operational synergies in multicriteria analysis: Strengthening PROMETHEE with ideas of AHP. Eur. J. Oper. Res. 153(2), 307–317. https://doi.org/10.1016/S0377-2217(03)00153-X (2004).
Yuan, J. et al. Social network analysis for social risks of construction projects in high-density urban areas in China. J. Clean. Prod. 198, 940–961. https://doi.org/10.1016/j.jclepro.2018.07.109 (2018).
Baumgertel, A. & Dragović, N. Risk management of a torrential flood construction project using the Monte Carlo simulation. Gazette Fac. Adm. Fac. For. Univ. Belgrade. 114, 29–44. https://doi.org/10.2298/GSF1614029B (2016).
Siksnelyte, I., Zavadskas, E. K., Streimikiene, D. & Sharma, D. An overview of multi-criteria decision-making methods in dealing with sustainable energy development issues. Energies 11(10), 2754. https://doi.org/10.3390/en11102754 (2018).
Xu, D. & Peng, L. An improved method based on TODIM and TOPSIS for Multi-attribute decision-making with multi-valued neutrosophic sets. Comput. Model. Eng. Sci. 129(2), 907–926. https://doi.org/10.32604/cmes.2021.016720 (2021).
Garg, N., Yadav, S. & Aswal, D. K. Monte Carlo simulation in uncertainty evaluation: Strategy, implications and future prospects. MAPAN J. Metrol. Soc. India 34, 299–304. https://doi.org/10.1007/s12647-019-00345-5 (2019).
Garg, N. et al. Measurement uncertainty in microphone free-field comparison calibrations. MAPAN J. Metrol. Soc. India 34, 357–369. https://doi.org/10.1007/s12647-019-00343-7 (2019).
Rachakonda, P., Ramnath, V. & Pandey, V. S. Uncertainty evaluation by Monte Carlo method. MAPAN J. Metrol. Soc. India 34, 295–298. https://doi.org/10.1007/s12647-019-00347-3 (2019).
Qazi, A., Shamayleh, A., El-Sayegh, S. & Formaneck, S. Prioritizing risks in sustainable construction projects using a risk matrix-based Monte Carlo simulation approach. Sustain. Cities Soc. 65, 102576. https://doi.org/10.1016/j.scs.2020.102576 (2021).
Akbar, M. A., Naseem, A., Ahmad, Y. & Zaman, U. K. U. Production risk analysis and prioritization in manufacturing industry: A hybrid approach using Monte Carlo simulation and DEMATEL analysis. Ain Shams Eng. J. https://doi.org/10.1016/j.asej.2024.102756 (2024).
PIDE, Annual Reports, Pakistan Institute of Development Economics, Pakistan (2017).
Jamal, N. Can Pakistan become a hub of auto exports? Dawn newspaper, Karachi, Pakistan (2021).
Rauf Khan, M., Ahmad, Y. Failure of automobile manufacturing in Pakistan—A case of the Revo Car. Interdiscip. J. Contemp. Res. Bus. 4(4), (2012).
Chaudhry, Z. E. A. A long road to a faster lane? Can Pakistan's automotive industry take the plunge into the 21st century? Aurora Magazine by Dawn Pakistan, Karachi, Pakistan (2021).
Khan, A. Auto assemblers flexing muscles for another price hike. Dawn newspaper, Karachi, Pakistan (2021).
Nawaz, U. Impact of duties and taxes on the sales of automobiles industry in Pakistan. J. Finane Acc. Manag. 14(2), 47–59 (2023).
Zheng, H., Liu, S., Zhang, H., Yu, J. & Bao, J. Visual-triggered contextual guidance for lithium battery disassembly: A multi-modal event knowledge graph approach. J. Eng. Des. https://doi.org/10.1080/09544828.2024.2301876 (2024).
Baig, M. A. Democratising Pakistan’s automotive industry. AURORA by Dawn News (2021).
Mustafa, S., Begum, R., Nisar, S. K. & Osama, A. Impact of new 5 year automobile policy (2016–21) on the profitability of major players in the automobile industry of Pakistan. Eur. Sci. J. 14(16), 165. https://doi.org/10.19044/esj.2018.v14n16p165 (2018).
Morgan, D. L. Practical strategies for combining qualitative and quantitative methods: Applications to health research. Qual. Health Res. Sage 8(3), 362. https://doi.org/10.1177/104973239800800307 (1998).
Zikmund, W. G. Business Research Methods. Health Economics Research Method (2003).
Yin, H., Guo, B., Huang, X., Huo, Z. & Zhao, L. Scenario-based analysis for industrial project planning in the context of carbon peaking: Case study city, China. Clean. Environ. Syst. 10, 100134. https://doi.org/10.1016/j.cesys.2023.100134 (2023).
Barreras, A. J. Risk management—Monte Carlo simulation in cost estimating. PMI (2012).
Author information
Authors and Affiliations
Contributions
Sarmad Farooq: Conceptualization, methodology, data collection, analysis and interpretation, writing. Afshan Naseem: Supervision (project), approval of the final version. Yasir Ahmad: Supervision (project), approval of the final version. Muhammad Awais Akbar: Writing and editing (initial version). Mehran Ullah: Review and editing of the final version, funding acquisition.
Corresponding author
Ethics declarations
Competing interests
The authors declare no competing interests.
Additional information
Publisher's note
Springer Nature remains neutral with regard to jurisdictional claims in published maps and institutional affiliations.
Supplementary Information
Rights and permissions
Open Access This article is licensed under a Creative Commons Attribution 4.0 International License, which permits use, sharing, adaptation, distribution and reproduction in any medium or format, as long as you give appropriate credit to the original author(s) and the source, provide a link to the Creative Commons licence, and indicate if changes were made. The images or other third party material in this article are included in the article's Creative Commons licence, unless indicated otherwise in a credit line to the material. If material is not included in the article's Creative Commons licence and your intended use is not permitted by statutory regulation or exceeds the permitted use, you will need to obtain permission directly from the copyright holder. To view a copy of this licence, visit http://creativecommons.org/licenses/by/4.0/.
About this article
Cite this article
Farooq, S., Naseem, A., Ahmad, Y. et al. Identification and prioritization of risks for new entrants in automobile sector using Monte Carlo based approach. Sci Rep 14, 12571 (2024). https://doi.org/10.1038/s41598-024-62803-8
Received:
Accepted:
Published:
Version of record:
DOI: https://doi.org/10.1038/s41598-024-62803-8