Table 7 Path coefficient estimates.
Path coefficients | T statistics | P values | Results | ||
|---|---|---|---|---|---|
H1a | EA −> IM | 0.161 | 3.205 | 0.001** | Accepted |
H1b | EA −> CA | 0.373 | 6.886 | 0.000*** | Accepted |
H1c | EA −> SA | 0.307 | 6.122 | 0.000*** | Accepted |
H2a | IM −> CA | 0.139 | 2.99 | 0.003** | Accepted |
H2b | IM −> SA | 0.069 | 1.543 | 0.123 | Rejected |
H3a | CA −> SA | 0.318 | 6.458 | 0.000*** | Accepted |
H3b | CA −> IR | 0.352 | 7.341 | 0.000*** | Accepted |
H3c | CA −> SSU | 0.325 | 6.812 | 0.000*** | Accepted |
H4a | SA −> IR | 0.351 | 7.262 | 0.000*** | Accepted |
H4b | SA −> SSU | 0.272 | 5.58 | 0.000*** | Accepted |
H5 | IR −> SSU | 0.189 | 3.77 | 0.000*** | Accepted |