Introduction

Clinical High Risk for psychosis (CHR) describes a state characterized by young people who have a heightened risk of developing a psychotic disorder [1], with a 20–30% transition likelihood within 2–3 years [2, 3]. Subsyndromes include the attenuated positive symptom (APS) syndrome, the genetic risk for psychosis accompanied by a recent decline in functioning (GRD), and the brief intermittent psychotic syndrome (BIPS) [4, 5]. Decline in social functioning, co-morbidity, and lower perceived quality of life are common, creating burden in the CHR state [6,7,8,9]. Preventive interventions could potentially ameliorate the high burden in CHR state and reduce the transition to psychosis [10, 11]. Discovering biomarkers based on brain abnormalities in CHR state will help identify those in need for indicated prevention [12].

Neuroimaging studies reveal widespread subtle structural abnormalities in CHR individuals, resembling those in psychotic disorders [13,14,15,16,17,18,19,20,21]. Using the largest pooled neuroimaging sample of CHR individuals to date, the Enhancing NeuroImaging Genetics through Meta-Analysis [ENIGMA] CHR working group found widespread cortical thinning in CHR individuals [13]. Those who later transitioned to psychosis (CHR-T) showed lower cortical thickness in fusiform, superior temporal, and paracentral regions than non-transitioners (CHR-NT) [13]. Smaller surface area in the right superior frontal, right superior temporal, and bilateral insular cortices distinguished CHR-T from healthy controls (HC) [18]. Additionally, both CHR individuals and schizophrenia patients show greater intra-group variability in morphometric profiles than HC [14, 22], suggesting disease-related divergence. If regions diverge differently, greater variability in CHR may weaken inter-regional covariance. If regions diverge similarly, this variability may reflect shared patterns of abnormal network organization or reorganization.

Evidence from patients with schizophrenia and at-risk individuals suggests that psychotic disorders may compromise optimal brain network configurations [23,24,25]. Brain networks can be identified using structural covariation in grey matter, an established method characterising concomitant morphometric variations (e.g., thickness and gyrification) among distributed regions [26]. Covariation between regions follows the homophilic principle, where morphometrically similar regions are likely axonally connected [26, 27]. Regions within structural covariance networks share maturation trajectories [28, 29], as well as functional [30,31,32] and transcriptomic [33] similarity, and their disruption may indicate developmental alterations and/or pathological development [23, 34]. Importantly, the topology of neurotypical brain networks exhibits small-world architecture, balancing local segregation and global integration through hierarchical modular structures [35, 36]. This architecture supports cognition [37], remains robustness against focal atrophy, and limits the spread of abnormalities [38, 39] (supplementary background). However, globally, schizophrenia shows lower integration [24, 40, 41] and higher segregation [40, 42] compared to controls, while bipolar disorder has intermediate integration loss [24]. In schizophrenia, frontal networks are weakened and less hierarchical than controls, increasing integration [36, 40, 43], whereas posterior networks fragment into smaller subnetworks, enhancing segregation [36, 40, 41, 43,44,45].

Few studies have used graph theory to examine structural brain alterations in individuals at risk for psychosis. Drakesmith and colleagues [46] observed lower global efficiency (lower integration) among healthy individuals with psychotic-like experiences than those without. Sandini and colleagues [47] reported higher modularity and clustering coefficient (increased segregation) in individuals with 22q11.2 Deletion Syndrome and attenuated psychotic symptoms, compared to those without symptoms and healthy controls. In CHR individuals, Das and colleagues [48] observed lower small-worldness, lower integration, and higher segregation in CHR-T than CHR-NT. In contrast, individuals at familial risk for psychosis without psychotic symptoms showed no global network disruptions [49,50,51], despite frontal nodal differences and topological alterations during infancy [52]. This suggests that the structural network topographical alterations may be state-dependent, but previous studies with small or moderate sample sizes leaves it unclear whether structural network topology reliably differentiates individuals at risk for psychosis or predicts transition to psychosis.

Understanding structural network topology in CHR is crucial, as the network hypothesis of schizophrenia suggests that structural deficits propagate through strongly connected regions [53,54,55,56]. Initial focal atrophy may spread within the same network due to disruptions of signalling, trophic support, and/or neurotransmitter systems [57], suggesting network architecture as a potential roadmap for pathological progression. Regions covarying with existing atrophy may be the next affected. Evidence supporting the network hypothesis spans first-episode, chronic, and treatment-resistant schizophrenia [55, 56, 58]. For example, Regional deficits can be predicted by deficits of neighboring regions and their connectivity [56, 58]. these network-driven structural patterns align with cytoarchitectonic classes [58] such as the limbic class [59, 60], linking pathology across different system levels.

Furthermore, the brain’s small-world and modular architecture implies that pathological spread occurs in stages [61] (supplementary background). Optimal small-world configuration reduces network vulnerability to focal atrophy in networks (stage 1) [62, 63]. Network distinctiveness (characterized by within-network specialization and between-network segregation) constrains atrophy within networks (stage 2) [64] and delays cascading effects that would result in multinetwork failures (stage 3), as seen in schizophrenia [65]. Therefore, we expected network distinctiveness to vary across breakdown stages: lower in stage 1, higher in stage 2, and lower again in stage 3, driven by within-network covariance in the stage 1 and 2 and by between-network covariance in stage 3. To fully understand pathological spread, it is essential to consider network distinctiveness alongside both within- and between-network covariance.

We aimed to elucidate structural covariance network alterations in CHR individuals at global level and local network levels using a large ENIGMA CHR working group. At the global level, we measured covariation strength, integration, segregation, and the balance between segregation and integration, expecting disruptions in CHR individuals compared to HC due to subthreshold symptoms and functional decline [1, 4, 5, 66]. At the network-level, we examined network distinctiveness using the system segregation index [39], which quantifies the within- and between-network covariance difference normalised by the within-network covariance. Based on prior studies [40, 41, 43], we hypothesized that network distinctiveness would be associated with future transition status, depending on network breakdown stages [54, 61]. Lastly, we tested the relationship between network distinctiveness and symptom severity in CHR [47], and explored heterogeneity across CHR subsyndromes.

Methods

Participants

Our final imaging sample (Table 1) comprised 1282 healthy controls (700 males) and 1582 CHR individuals (811 males) from ENIGMA-CHR working group [13]. The mean ages [ranges] were 22.2 [12.0, 39.9] and 20.6 [9.5, 39.8], respectively. The CHR group comprised 229 CHR-T (14.5%), 1102 CHR-NT and 251 unknown transition status. Median follow-up durations [ranges] were 158 [2–316], 152 [2–325], and 57 [1–327] months, respectively (eMethod 1). Among CHR individuals with subsyndrome classification, 1325 met criteria for APS (Attenuated Positive Symptom Syndrome via Structured Interview for Prodromal Symptoms, SIPS [4] or Attenuated Psychosis Group via Comprehensive Assessment of At Risk Mental States, CAARMS [5]), 235 for GRD (Genetic Risk and Deterioration Syndrome via SIPS or Vulnerability Group via CAARMS), and 79 for BIPS (Brief Intermittent Psychotic Symptom Syndrome via SIPS or Brief Limited Intermittent Psychotic Symptoms Group via CAARMS) (eTable 25). All 31 sites obtained local institutional review board approval. Informed written consent was obtained for all participants and/or their legal guardians.

Table 1 Demographics and clinical characteristics.

Data acquisition and preprocessing

Data were preprocessed using the ENIGMA pipeline [13, 14]. T1 brain images (eMethod 2) were parcellated into 34 cortical regions per hemisphere based on Desikan-Killiany atlas [67] and 8 subcortical regions (eMethod 1 and eTable 10) using Freesurfer v6.0. Cortical thickness, surface area and subcortical volumes were extracted. The ENIGMA quality control protocol (https://github.com/ENIGMA-git/ENIGMA-FreeSurfer-protocol) was applied. Site and scanner-associated effects were corrected using NeuroCombat harmonisation [68], a batch-adjustment method based on the empirical Bayes framework and used by previous studies [13,14,15,16,17].

Structural covariance network construction

Following prior work [69], we constructed the structural covariance matrix using cortical thickness (CT), cortical surface area (SA) and subcortical volume (Fig. 1). CT and SA of the same brain region were treated as separate nodes due to their distinct genetics [70, 71], neurobiology [72,73,74,75], and maturation trajectories [76, 77] (see supplementary methods). Disruptions in SA and CT may reflect different pathological changes. Combining them into a covariance matrix reveals how morphometric features are organized by connectivity during neurodevelopment. Given that CT and SA mature differently across regions [78,79,80]—e.g., sensory and motor areas develop earlier than the association cortex [79, 81]— this approach captures developmental coordination, and disruptions thereof.

Fig. 1: Construction of structural covariance network.
Fig. 1: Construction of structural covariance network.The alternative text for this image may have been generated using AI.
Full size image

In line with previous work [44], we constructed the structural covariance matrix using cortical thickness, cortical surface area and subcortical volume. For each participant, the cortical thickness and cortical surface area estimates from 34 ROIs [42], and the volumes of 8 subcortical regions, from each hemisphere represented 76 nodes in the covariance matrix after averaging across hemispheres, covariate regression, z-score transformation and covariation calculation based on z-score differences. A high value in the covariance matrix suggests that two nodes differed similarly from the controls (i.e growing or shrinking together). One covariance matrix was obtained for each participant, representing the individualised pattern of covarying brain morphology. ROI region of interest; CHR clinical high risk; L left; R right; Mc mean of the control group; SDc standard deviation of the control group.

Due to practical considerations (supplementary methods), regional values including CT, SA, or subcortical volume were averaged across the two hemispheres [69], unless one was missing, in which case the available value from the other hemisphere was used. Each participant had 76 node values: 34 for CT, 34 for SA, and 8 for subcortical volume. Further, age, sex and brain size (mean CT for CT, total SA for SA, and total intracranial volume for subcortical volume) were regressed out. We controlled for brain size due to heterogeneous scaling of brain properties with brain size. Among others, SA, compared to CT, and associative cortices, compared to sensorimotor cortices, increase more rapidly with greater brain sizes [26, 82]. In light of these findings and the observation that CT and SA are affected differently in CHR individuals [13], we used morphometric-type specific brain size metrics (for SA and CT separately) to correct CT and SA measures in our covariance matrix to minimize bias (supplementary methods).

Next, means and standard deviations were calculated across controls. Each participant’s node values were z-transformed by subtracting the control mean and dividing by the control standard deviation, with z-scores indicating relative thickness, surface area, or volume differences. Finally, node covariation, based on z-score differences, was calculated using the equation in Fig. 1 (eMethod 3), where high covariation reflects similar deviations from controls. Each participant’s covariance matrix captured individualized patterns of brain morphology.

Global network topographical properties

Global topographical and network-level metrics were calculated in Matlab software (R2016b version, Brain Connectivity Toolbox). The structural covariance matrix from each participant was thresholded at sparsity levels from 0.10 to 0.25 (top 10–25%) in 0.01 steps [22, 44]. We calculated the following measures (also see supplementary methods): 1) global efficiency (information integration via shortest paths); 2) clustering coefficient (clustering among node neighbours), and 3) small-worldness (balance between clustering and path length). To avoid threshold bias, each graph measure was summarised by calculating the area under the curve (AUC) across sparsity levels (integral of metrics across sparsity levels via trapezoidal method) [83].

Community detection and network distinctiveness

The Desikan-Killiany atlas [67] is a gyral-based and does not directly map to intrinsic brain networks like the Yeo et al. parcellation [84]. To identify network architecture, we applied two-step community detection to structural covariance matrices (eMethod 5) [85]. Using the Louvain method [86], we performed community detection at individual (step 1) and group (step 2) levels across sparsity levels from 0.1 to 0.25 (step of 0.01). To determine community structure, we empirically assessed resolution (gamma). Individual-level detection used gamma 1 and 2, while group-level detection tested gamma 1 to 5, yielding 10 community structures. Median community size was plotted against gamma (eFigure 3) to identify elbow points, indicating stable resolution. We then compared node assignments to communities (from community detection) and the Desikan-Killiany parcel [67] assignment to intrinsic networks [84] using a winner-takes-all approach. For example, the paracentral parcel was assigned to the somatomotor network since 82.1% of its vertices belonged to this network. Similarity between community and network assignments was evaluated using the Rand coefficient z-score [87], with higher values indicating greater alignment. Based on stability (elbow value) and similarity (Rand z), the optimal gamma was determined to be 2 at the group level and 1 at the individual level (eMethod 5, eFigure 3).

Finally, the network distinctiveness of each community within the community structure was measured by the system segregation index [39] (subtracting the mean between-community from the mean within-community covariance and dividing the difference by the mean within-community covariance).

Statistical analysis

Group comparisons

Statistical analyses were performed in R software (version 4.2.1). Group comparisons between CHR and controls used t-tests for continuous variables and Chi-square tests for categorical variables (except follow-up duration and symptom scores).

For subgroup comparisons, CHR individuals with unknown subgroup status (e.g. unknown psychosis transition status at follow-up, unknown APS status for APS subgroup comparison, etc.) were excluded. Due to highly imbalanced subgroup sizes, categorical variables were analyzed using the Rao-Scott corrected weighted Chi-square test [88] (survey, R package 4.2-1) and continuous variables with sample-sized-weighted analysis of variance (ANOVA) (except for follow-up duration and symptom scores). Initial comparisons included three-group analyses (e.g., controls vs. CHR-NT vs. CHR-T; controls vs. APS vs. non-APS), followed by pairwise comparisons for significant results.

Symptom scores were analyzed using linear mixed modeling (LMM) with age and sex as fixed effects and site as a random effect (lmerTest, R package 3.1-3). LMM was also used for follow-up duration with site as a random effect.

Given the skewed distribution of global efficiency and system segregation indices (see Q-Q plots in eFigure 5), group comparisons for these measures used values within 3 median absolute deviations from the median across all communities and participants (eMethod 6).

Additionally, five sensitivity analyses were conducted: (1) To explore the medication influence, we repeated the comparisons additionally controlling for antipsychotic medication exposure (information available among 72.5% CHR-T and 87.1% CHR-NT individuals) for all the significant group differences. (2) To evaluate the influence of sites, we conducted leave-one-site-out (LOO) analyses (eMethod 7). (3) To examine whether the network findings were complementary to regional differences, we repeated the network-level group comparisons adding the mean within-community regional features (SA, CT or subcortical volume) as a covariate. (4) For communities with significant group differences in system segregation indices, within- and between-community covariance differences were also tested. (5) To evaluate the lateralisation effects, we repeated the group comparisons 1) without averaging the morphometric measures across the hemispheres using the current sample (N = 2864) and 2) using the smaller sample where all 152 morphometric values must be available (N = 1735).

Association between brain metrics and symptom scores

To examine the clinical implications of group differences, we used LMM to test the association between symptom scores and the brain metrics showing significant group differences, including fixed effects of brain metric, age and sex and the random effect of site. For transition-related brain metrics, we included both the main effect and the interaction with transition group to rule out confounding by group differences. Because most sites used either Scale of Psychosis-risk Symptoms (SOPS) or CAARMS but not both (SOPS only = 21, CAARMS only = 8, both SOPS and CAARMS = 1; BPRS only = 1), we z-transformed the SOPS positive symptom scales and CAARMS positive symptom scales (the most comparable subscales among others) using the mean and standard deviation of the whole CHR SOPS group and the whole CHR CAARMS group, respectively. We then tested associations between brain metrics and these positive-symptom z-scores using the combined SOPS and CAARMS samples. We further tested the associations for participants assessed using SOPS, due to the larger sample size.

For clinical symptom analysis, multiple comparison correction using false discovery rate (FDR) method [89] was applied across 7 SOPS domains or 4 CAARMS domains. For brain metrics, FDR correction was applied across global measures (4 measures) or network-level communities (n = 9).

Results

A less efficient network configuration in CHR

On average, CHR individuals exhibited lower covariance strength than controls (FDR-corrected p, denoted as q < 0.001, Cohen’s d = 0.164, see Fig. 2A and eTable 8). CHR also showed a less efficient global network configuration compared to controls, with lower global efficiency (q = 0.027, d = 0.100) and lower clustering coefficient (q = 0.027, d = 0.087) (Fig. 2B and eTable 8). Small worldness did not differ between CHR and controls (eTable 8). Global differences remained after controlling for antipsychotic exposure and were stable in the LOO site-effect sensitivity test (eResults 4 and 5) and the lateralisation-effect test (eResult 6 and eTable 16).

Fig. 2: A less efficient network configuration in CHR.
Fig. 2: A less efficient network configuration in CHR.The alternative text for this image may have been generated using AI.
Full size image

A mean structural covariance matrix for healthy controls (left) and CHR individuals (right). Rows and columns follow the same order of 76 nodes (top to bottom and left to right). The colours indicate the covariance strength, with the lowest in blue and the highest in red. The white gridlines separate CT, SA and volume nodes. CHR individuals exhibited lower structural covariance than controls. B Bar charts (with standard errors) indicating lower global efficiency, local efficiency, and clustering coefficient in CHR individuals. CHR clinical high risk; CT cortical thickness; SA cortical surface area; Vol subcortical volume.

Among subgroups (eResults 3), BIPS showed lower small-worldness than non-BIPS and controls, while APS had higher small-worldness than non-APS. No differences were found in GRD subgroups or between APS and controls. These subgroup results were unaffected by antipsychotic exposure or site effects.

Frontotemporal network distinctiveness differences between CHR-T and CHR-NT

We detected nine network-level communities (Fig. 3A, eResult 2 and eTable 10). Given that one of the community structure identification criteria was similarity to the intrinsic networks [46], community grouping largely followed intrinsic networks, though not identically due to large Desikan atlas regions. Subcortical regions were grouped within the same community. CT and SA metrics from the visual were grouped together and CT and SA metrics from the motor were in the same community. In contrast, CT and SA metrics from frontal and temporal regions were grouped according to morphometric types.

Fig. 3: Network distinctiveness was higher in frontal and temporal SA communities and lower in a frontal CT community in CHR-T versus CHR-NT.
Fig. 3: Network distinctiveness was higher in frontal and temporal SA communities and lower in a frontal CT community in CHR-T versus CHR-NT.The alternative text for this image may have been generated using AI.
Full size image

A Nine identified communities (colours) projected to surface (cortical regions) or structural image (subcortical regions). Among others, SA and CT of occipital and sensorimotor areas, and subcortical brain volumes, were grouped together into the same communities. Separate SA and CT communities were identified for temporal and frontal regions. B Bar charts (with standard errors) visualizing higher frontal and temporal SA system segregation index, and lower frontal CT community segregation index in CHR-T versus CHR-NT (FDR-corrected across 9 communities). Horizontal bar with * indicates significant group difference after FDR correction (q < 0.05). C mean structural covariance matrix for healthy controls (left), CHR-NT (middle) and CHR-T individuals (right). Rows and columns were grouped according to the 9 communities. The colour bars on the left and the bottom of each matrix and the colour boxes along the diagonal of each matrix indicate the community following the same colour scheme in Fig. 3A. Within each matrix, the colours indicate the covariance strength, with the lowest in blue and the highest in red. CHR-T individuals at clinical high risk for psychosis who transited to psychosis later in the follow-up; CHR-NT individuals at clinical high risk for psychosis who did not transit to psychosis later in the follow-up; CT cortical thickness; SA cortical surface area; q FDR corrected p value; FDR false discovery rate.

CHR-T exhibited higher temporal and frontal system segregation index (i.e., greater network distinctiveness) of SA communities than CHR-NT (temporal q < 0.001, ES = 0.237; frontal q < 0.001, ES = 0.223) and controls (temporal q < 0.001, ES = 0.219; frontal q < 0.001, ES = 0.218) (Fig. 3B). No significant difference was observed between CHR-NT and controls (eTable 9). In contrast, CHR-T had lower frontal CT community system segregation index than CHR-NT (q < 0.001, ES = 0.208) and controls (q = 0.004, ES = 0.165), with no differences between CHR-NT and controls (Fig. 3B).

Group differences in these communities remained significant after controlling for within-community mean SA or CT (eTable 9). Frontal SA or CT community differences persisted after controlling for antipsychotic exposure and were stable in LOO site-effect sensitivity tests (eResult 4) and the lateralisation-effect test (eResult 6 and eTable 16).

Within-network connectivity in temporal SA and frontal SA communities was higher in CHR-T than CHR-NT (temporal q < 0.001, ES = 0.092; frontal q < 0.001, ES = 0.097) and controls (temporal q = 0.002, ES = 0.195; frontal q = 0.004, ES = 0.173) (eTable 9). In contrast, within-network connectivity in frontal CT network was lower in CHR-T than CHR-NT (q = 0.011, ES = 0.099) and controls (q < 0.001, ES = 0.211). Between-community covariance did not significantly differ between CHR-T and CHR-NT.

These results suggest that the higher network distinctiveness of frontal and temporal surface area communities in CHR-T was driven by higher within-community covariance, not between-community alterations (eFigure 6). Similarly, the lower network distinctiveness of the frontal CT community in CHR-T was due to lower within-community covariance (eFigure 6).

Among the subgroups (eResult), no differences were found between APS and non-APS, or GRD and non-GRD groups. Interestingly, similar to transition-related difference, BIPS showed higher system segregation index in frontal and temporal SA communities than non-BIPS and controls. BIPS individuals had a higher percentage of CHR-T (31.9% of 71 BIPS) compared to APS (16.5%) or GRD (20.9%).

Relationship between network distinctiveness and clinical symptoms

No global network configuration measures were associated with clinical symptom severity. Instead, symptom associations were observed at the network level (eTable 11 and 12).

Using positive symptom z-scores from sites using SOPS or CAARMS, we found a significant interaction between transition status and the frontal SA community system segregation index (p = 0.038, only positive symptom z-scores were combined and thus no correction applied). Post-hoc analysis revealed that a greater frontal SA segregation index was associated with higher positive symptom z-scores in CHR-NT (p = 0.004), but not in CHR-T (p = 0.177).

This was replicated in sites using SOPS alone (interaction uncorrected p = 0.018, q = 0.071, eTable 11). Specifically, greater frontal SA community system segregation index was associated with greater SOPS positive symptoms in CHR-NT (q = 0.008), but not in CHR-T (q = 0.536) (eTable 12, Fig. 4, top row).

Fig. 4: Association between network distinctiveness and clinical symptoms.
Fig. 4: Association between network distinctiveness and clinical symptoms.The alternative text for this image may have been generated using AI.
Full size image

Residuals, after removing the effects of age, sex and random intercepts of site from the clinical scores estimated using the LMM method, were plotted against the system segregation index of the frontal communities. Each dot represents one participant. The lines indicate the fitted association. The beta and p values were estimated using the LMM method before FDR correction. Upper panel: Higher frontal SA community system segregation index was associated with higher SOPS positive symptom score in CHR-NT (q = 0.008). CHR-T was higher in frontal SA system segregation index and SOPS positive symptom score than CHR-NT. Lower panel: The lower frontal CT community was associated with higher SOPS negative symptom scores in CHR-T (uncorrected p = 0.016, q = 0.063). CHR-T was lower in the frontal CT community system segregation index and higher in SOPS negative symptom scores than CHR-NT. CHR-T individuals at clinical high risk for psychosis who transited to psychosis later in the follow-up; CHR-NT individuals at clinical high risk for psychosis who did not transit to psychosis later in the follow-up; SA cortical surface area; CT cortical thickness; SOPS Scale of Psychosis-risk Symptoms; LMM linear mixed modelling; q FDR corrected p value; FDR false discovery rate; * significant at both uncorrected p < 0.05 and corrected p < 0.05; + significant at uncorrected p < 0.05 but did not survive multiple comparison corrections.

Moreover, a significant interaction between transition status and the frontal CT community segregation index was found for SOPS negative symptoms (q = 0.032, eTable 11). Post-hoc analysis revealed that lower frontal CT community system segregation index was associated with more severe SOPS negative symptoms in CHR-T (uncorrected p = 0.016, q = 0.063, Fig. 4 bottom row), but not in CHR-NT (q = 0.806, eTable 12).

Discussion

To better understand network-level alterations in CHR for psychosis, we investigated structural covariance networks and their symptom associations in a large CHR sample, yielding three key findings: First, at the global level, CHR individuals exhibited lower structural covariance and a less optimal structural network configuration than controls (i.e., lower global efficiency and lower clustering coefficient), with BIPS individuals showing lower small-worldness than non-BIPS individuals or controls. Second, CHR-T and CHR-NT differed only in frontotemporal network distinctiveness, not global metrics. This distinctiveness also separated BIPS from non-BIPS but not APS or GRD subgroups. Third, network-level metrics were associated with symptom severity in a transition-status-dependent manner: lower system segregation indices in the frontal SA network were related to lower positive symptoms in CHR-NT, while lower system segregation indices in the frontal CT network were related to higher negative symptoms in CHR-T. These findings highlight the role of network topography in psychosis transition.

Structural network configuration in CHR is less coordinated and suboptimal

As expected, CHR individuals differed from healthy controls in global network configuration. These findings align with prior research from the ENIGMA CHR-P Workgroup, which reported subtle yet widespread structural differences [13], deviations from normative values [15], and greater anatomical deviance at the individual level [14] in CHR. In this study, the lower structure covariance in CHR might reflect reduced primary synaptic connections due to perinatal neurodevelopmental insults [90]. Without adequate protective effects from the primary connections, synaptic connections may suffer during pruning and result in a lower survival rate, leading to lower structural covariance.

Despite preserved integration-segregation balance (i.e., no small-worldness differences), CHR individuals exhibited a less optimal global network configuration than controls, as indicated by lower global efficiency and clustering coefficient. Lower global efficiency implies lower global communication capacity, while lower clustering coefficient indicates that network neighbours were less likely to form clusters for efficient local processing [91,92,93]. Interestingly, two recent studies [40, 94] showed that individuals with schizophrenia could be vulnerable to nodal attack. Qualifying nodes into different types based on how well connected they were, Palaniyappan and colleagues [40] demonstrated that structural covariance networks in schizophrenia were particularly sensitive to hub (the highly connected nodes) removal. Future studies should examine whether CHR individuals exhibit similar vulnerabilities due to their suboptimal network configuration.

Frontotemporal network deviation from typical development

CHR-T individuals exhibited greater network distinctiveness in the frontal and temporal SA networks and lower distinctiveness in the frontal CT network compared to CHR-NT and controls. CHR-T individuals also had more severe positive and negative symptoms than CHR-NT. Given the study-specific control groups well matched with the CHR individuals on both site effects and participant backgrounds, such differences indicated deviations from typical development rather than merely normal individual variability. Importantly, across all three frontotemporal networks, CHR-T participants deviated from controls in the same direction as from CHR-NT, while CHR-NT did not differ from controls. Lifespan studies [95] showed that early life to young adulthood is dominated by greater global integration and reduced segregation. From adolescence to young adulthood, the frontoparietal and dorsal attention networks undergo increased between-network covariance and decreased within-network covariance [96]. In our study, network distinctiveness differences were driven by altered within-network covariance, suggesting frontotemporal developmental trajectory deviations from typical development may be linked to a higher transition risk in CHR.

Though both CT- and SA-based frontal network distinctiveness deviated from typical development in CHR-T, the deviations were in opposite directions. CT and SA have distinct genetics [70, 71], neurobiology [72,73,74,75], and maturation trajectories [76, 77]. Genetically, CT is linked to post-mid-fetal processes including branching, synaptic pruning and myelination, while SA are related to moderation of fetal neurogenesis [70]. Mechanically, in prenatal and perinatal development, CT reflects cellular density within radial units [72, 77], whereas SA is tied to radial unit density and neuron migration [72, 97]. From childhood to adolescence, a combination of normal neurodevelopmental mechanisms including synaptogenesis, gliogenesis, dendritic arborization, and intra-cortical myelination facilitate CT and SA changes [72,73,74,75]. Further, adolescence is a time when CT declines faster than SA [77], which coincides with large CT difference between CHR and controls than SA [13]. Frontal network differences could therefore be driven by a combination of neurodevelopmental differences and pathological processes [98]. Pathologically, CT changes can reflect abnormal synaptic plasticity [99, 100], neuroinflammation [101, 102], oxidative stress [103, 104], and neurotransmitter dysfunction [105]. Elevated free water, a marker of neuroinflammation, appears in first-episode psychosis but not CHR, indicating inflammation peaks around transition [106, 107]. Further research is needed to link frontal structural networks to specific pathologies [108].

Cortical thickness and surface area network distinctiveness: links to symptoms and transition

CHR-T individuals had more severe positive symptoms than CHR-NT, consistent with their higher risk of developing psychosis. As a group, CHR-T individuals also showed higher network distinctiveness in the frontal and temporal SA networks than CHR-NT and control individuals. These group differences implied that the frontotemporal SA network distinctiveness deviating from typical development may be related to positive symptom severity. This is further supported by findings in CHR-NT, where higher frontal SA network distinctiveness was associated with more severe positive symptoms. Notably, threshold positive symptom constitutes psychosis diagnosis, and CHR-T individuals eventually transitioned to psychosis during follow-up. These results suggested that atypical frontal SA network distinctiveness was associated with worsening symptoms in CHR until transition is imminent. At that point, frontal SA network distinctiveness may shift from increasing to decreasing due to the progression of atrophy from stage 2 to stage 3 (see The network hypothesis of schizophrenia), thereby losing its positive association with symptom severity in the CHR-T group.

Conversely, CHR-T individuals had more severe negative symptoms and less distinct frontal CT network than CHR-NT individuals. These group differences implied that the frontal CT network distinctiveness deviating from typical development may be related to negative symptom severity. This is further supported by findings in CHR-T, where lower frontal CT network distinctiveness was related to higher negative symptoms, an association absent in CHR-NT. This suggests that frontal CT network deviations emerge closer to psychosis onset (stage 1 in atrophy progression, see The network hypothesis of schizophrenia).

The network hypothesis of schizophrenia

The divergent transition-related frontal SA and CT network alterations in CHR-NT and CHR-T may reflect the different network breakdown stages (Fig. 5). The network-based spreading hypothesis states that structural deficits propagate to distant regions that are strongly connected with the initial regions [54,55,56]. Disruption of signalling, trophic support, and neurotransmitter system due to initial focal deficit can affect neuronal survival of the distal connected regions [57]. Hens and colleagues [61, 109] demonstrated that signal propagation was governed by path lengths, typically shorter within than between networks, translating network topology into predicted dynamic outcomes. Further, the human brain has small-world [110] and modular architecture [38] that stays robust to random focal atrophy [63] and buffers the atrophy from immediately spreading to multi-networks [64, 65]. Consequently, the signal propagation across networks follows a step-like pattern reflecting the discrete nature of cross-network advancements [61]. In this context, structural deficit propagation can be divided into three stages (Fig. 5A and see further detailed discussion in the supplementary): Stage one where focal structural deficits disturb the within-network covariance and lower the network distinctiveness; stage two where pathology dominates the within-network covariance and heightens the network distinctiveness; and stage three structural deficits spread to more networks resulting in lower network distinctiveness.

Fig. 5: Schematic representations of network breakdown stages.
Fig. 5: Schematic representations of network breakdown stages.The alternative text for this image may have been generated using AI.
Full size image

A Schematic representations of deficits spreading from stage 1 to 3 of network breakdown. Circles represent nodes in the network. Lines connecting the circles are edges in the network. Two networks are depicted where deficits (orange circle) spread from one network (left) to the other (right). Orange lines indicate the path of spreading from the initial deficit node in stage 1, followed by the spreading to four additional nodes within the network (left) in stage 2, and eventually affecting node of the other network (right) in stage 3. B Within (upper panel) and between (lower panel) network covariance of the frontal CT network. We interpreted the lower frontal CT network distinctiveness in CHR-T than CHR-NT to reflect stage 1 of the frontal CT’s network breakdown, which is driven by the lower within-network covariance (upper panel). C Within (upper panel) and between (lower panel) network covariance of the frontal SA network. We interpreted the higher frontal SA network distinctiveness in CHR-T than CHR-NT to reflect stage 2 of the frontal SA’s network breakdown, which is driven by the higher within-network covariance (upper panel). In B and C, lower between-network covariance in CHR-NT than controls may reflect the lower mean structural covariance in CHR than controls. Horizontal bars indicate significant group differences (q < 0.05). D Schematic representations of within (upper panel) and between (lower panel) network covariance changes across network breakdown stages. We expect that the stage 1 and 2 of network breakdown are dominated by within-network covariance changes. The between-network covariance increase in stage 3 due to deficit spreading across communities. E A schematic summary of the network breakdown stages. * based on the literature [22]. CHR-T individuals at clinical high risk for psychosis who transited to psychosis later in the follow-up; CHR-NT individuals at clinical high risk for psychosis who did not transit to psychosis later in the follow-up; CT cortical thickness; SA cortical surface area; q FDR corrected p value; FDR false discovery rate.

The lower frontal CT network distinctiveness and the association with clinical symptoms in CHR-T—but not CHR-NT may reflect the first stage of the network’s breakdown (Fig. 5A and B). CHR-T individuals, who transitioned to psychosis during follow-up, may experience pathological processes atop pre-existing CHR-related abnormalities, disrupting frontal CT network covariation (Fig. 5B upper) while sparing its connectivity with the rest of the brain (Fig. 5B lower). In contrast, increased frontal and temporal SA network distinctiveness, driven by higher within-network covariance, suggests these networks belong to a second stage (Fig. 5A, C). Frontal SA abnormalities in CHR are limited to 8 of 68 regions [13], and covariance with the rest of the brain remains intact (Fig. 5C lower), indicating it has not yet reached the third stage.

We expect psychosis onset with cascading effects that would result in multinetwork failures due to pathological signal spillover. Psychosis onset is expected when between-network covariance is affected. Previous studies suggest schizophrenia networks are less hierarchical and experience hyper-covariations compared to controls [36, 111, 112]. Though the CHR individuals in this study are in clinical stage one that is based on symptoms and functioning [113,114,115], brain networks exhibit different breakdown stages, highlighting neuroimaging network markers as early indicators of disorder progression.

Limitations and conclusions

Our study has several limitations. First, the findings are based on cross-sectional T1 structural data, while the network-based spreading hypothesis is inherently longitudinal. Longitudinal datasets are necessary to better characterize brain network changes across CHR stages and transitions to psychosis. Second, due to inter-site assessment differences, we could not assess the relationship between subsyndrome-related brain alterations and symptoms or use a larger sample for brain-symptom associations. Future studies with more homogeneous assessment tools [116] across sites are needed. Third, the ENIGMA cohort is pooled from existing studies from various sites. While we controlled for antipsychotic use, we lacked data on medication dose and duration. Lastly, due to the IRB constraints on data sharing from different sites, we do not have access to voxel/vertex level data. Research using finer brain parcellation and voxel/vertex level structural data could provide more sensitive and robust metrics for detect early changes [117, 118] and the possible lateralisation effects in CHR.

In conclusion, CHR individuals exhibit lower structural covariance and less optimal structural network configuration than controls. Greater frontotemporal SA network distinctiveness may indicate SA abnormality, even without transition to psychosis, with the frontal SA network linked to positive symptoms. Conversely, a less distinctive frontal CT network was associated with negative symptoms among those who later transitioned, suggesting additional transition-related mechanisms. These findings support the network-based spreading hypothesis, highlighting the value of network topography in understanding psychosis progression.